Alterations shall comply with 233.3.4. EXCEPTION: Where compliance with 809.2, 809.3, or 809.4 is technically infeasible, or where it is technically infeasible to provide an...
Search Results "Maximum Dimension"
Commonly Searched Documents
-
233.3.4 Alterations
-
233.3.4 Alterations
233.3.4 Alterations. Alterations shall comply with 233.3.4. EXCEPTION: Where compliance with 809.2, 809.3, or 809.4 is technically infeasible, or where it is technically...
-
Toilet Stalls [4.17]
Toilet Stalls [4.17] The standard stall in section 4.17 is wheelchair accessible. Since wheelchair accessible or "standard" stalls are designed to accommodate the broadest range...
-
10.3.2(3)
(3) Where technical infeasability [sic] in existing stations requires the accessible route to lead from the public way to a paid area of the transit system, an accessible fare...
-
Common Questions (Alterations and Additions)
Common Questions
-
TECHNICALLY INFEASIBLE
[DSA-AC] An alteration of a building or a facility, that has little likelihood of being accomplished because the existing structural conditions require the removal or alteration of a...
-
§8.26 Distribution of accessible dwelling units.
Accessible dwelling units required by §8.22, 8.23, 8.24 or 8.25 shall, to the maximum extent feasible and subject to reasonable health and safety requirements, be distributed throughout...
-
§ 38.107(a)(1)
Permanently installed fixtures may overlap this area a maximum of 6 inches, if the lowest portion of the fixture is a minimum of 9 inches above the floor, and may overlap a maximum of 19...
-
Section 37.43 Alteration of Transportation Facilities by Public Entities
Fourth, the term “maximum extent feasible” means that all changes that are possible must be made....
-
1002.4.3 Gaps
are at rest in the load and unload position, the vertical difference between the floors shall be within plus or minus 5/8 inches (16 mm) and the horizontal gap shall be 3 inches (75 mm) maximum...
-
Altered Elements on an Accessible Route
A second exception notes that compliance is required unless it is technically infeasible, in which case compliance is required to the maximum extent feasible (202.3, Exception 2)....
-
202.3 Alterations
In alterations, where compliance with applicable requirements is technically infeasible, the alteration shall comply with the requirements to the maximum extent feasible....
-
11B-1002.4.3 Gaps
at rest in the load and unload position, the vertical difference between the floors shall be within plus or minus 5/8 inches (15.9 mm) and the horizontal gap shall be 3 inches (76 mm) maximum...
-
1002.4.3 Gaps
are at rest in the load and unload position, the vertical difference between the floors shall be within plus or minus 5/8 inches (16 mm) and the horizontal gap shall be 3 inches (75 mm) maximum...
-
1002.4.3 Gaps
are at rest in the load and unload position, the vertical difference between the floors shall be within plus or minus 5/8 inches (16 mm) and the horizontal gap shall be 3 inches (75 mm) maximum...
-
11B-202.5 Alterations to qualified historic buildings and facilities
(3)(i) Alterations to historic properties shall comply, to the maximum extent feasible, with the provisions applicable to historic properties in the design standards specified in §35.151...
-
11B-202.5 Alterations to qualified historic buildings and facilities
(3)(i) Alterations to historic properties shall comply, to the maximum extent feasible, with the provisions applicable to historic properties in the design standards specified in §35.151...
-
11B-202.5 Alterations to qualified historic buildings and facilities
(3)(i) Alterations to historic properties shall comply, to the maximum extent feasible, with the provisions applicable to historic properties in the design standards specified in §35.151...
-
F202.3 Alterations
In alterations, where compliance with applicable requirements is technically infeasible, the alteration shall comply with the requirements to the maximum extent feasible. 3....
-
810.6.2 Routes and Destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
810.6.2 Routes and Destinations
Signs covered by this requirement shall, to the maximum extent practicable, be placed in uniform locations within the system....
-
4.1.6(3)(f)(ii)
(ii) Where it is technically infeasible to alter all performing areas to be on an accessible route, at least one of each type of performing area shall be made accessible.
-
Site Constraints
Platform lifts are permitted where "existing or other constraints" make ramp or elevator access "infeasible." This is intended to cover altered facilities where limited space or...
-
4.1.6(3)(e)(ii)
(ii) Where it is technically infeasible to install a required standard stall (Fig. 30(a)), or where other codes prohibit reduction of the fixture count (i.e., removal of a water...