Provide a foundation for future multi-site and international research in this field....
Search Results "Future Construction Theaters"
Commonly Searched Documents
-
Database Development
-
Jean Tessmer
I have used this tool for concrete, asphalt, and raised board walk construction work on federal and private commercial projects....
-
Using the Conditions for an Exception in FSORAG
Condition for an Exception 2: Where compliance with the technical requirement cannot be accomplished with the prevailing construction practices....
-
INTRODUCTION
INTRODUCTION This document presents uniform standards for the design, construction and alteration of buildings so that physically handicapped persons will have ready access to and use...
-
Accessible Route to Exercise Machines and Equipment
The Department believes that this requirement is a reasonable one in new construction and alterations because accessible exercise machines and equipment can be located so that an accessible...
-
Water Flow Height
However, providing cup dispensers as an alternative to a compliant unit is not recognized by these guidelines in new construction or alterations....
-
11B-216.4.1 Exit doors
An exit passageway is a horizontal exit component that is separated from the interior spaces of the building by fire-resistance-rated construction and that leads to the exit discharge or...
-
Q15: Other Requirements Triggered by Road Resurfacing Alterations
504 regulation (applicable to recipients of DOT Federal financial assistance), require the provision of curb ramps if the sidewalk is installed or altered at the intersection, during new construction...
-
203.1 General
EXCEPTION: In new construction, full compliance with the requirements of these standards is not required where an entity can demonstrate that it is structurally impracticable to meet the...
-
Exemptions for an Entire Trail or Beach Access Route [1017.1, Exception 2 and 1018.1, Exception 2]
When extreme or numerous conditions for exceptions make it impractical to construct a trail or beach access route that complies with the technical requirements, the ABA Standards provide...
-
R205 Alternate Pedestrian Access Routes (Section-by-Section Analysis)
R205 Alternate Pedestrian Access Routes (Section-by-Section Analysis) Alternate pedestrian access routes must be provided when a pedestrian circulation path is temporarily closed by construction...
-
R101.1 General
Compliance with this document is mandatory when required by regulations issued by federal agencies that include accessibility standards for the design, construction, and alteration of pedestrian...
-
Handrails
Yes __ No __ N/A __ Comments: ___________________________________________ ...are the handrails continuously grippable, without interruption by vertical supports, newel posts, or other construction...
-
TABLE OF CONTENTS
Disabilities MAKING THE BUILT ENVIRONMENT ACCESSIBLE Access to Programs and Services in Exisiting Facilities Element-by-Element Safe Harbor for Existing Facilities Alterations New Construction...
-
Pit Toilet
Pit toilets are provided primarily for resource protection and are only constructed at recreation sites with a Recreation Site Development Scale level of 2 of less....
-
Pit Toilet
Pit toilets are provided primarily for resource protection and only are constructed at recreation sites with a Recreation Site Development Scale level of 2 of less....
-
Proposed Guidelines Developed Specifically for Pedestrian Facilities in the Public Right-of-Way
make allowances for typical roadway geometry and permit flexibility in alterations to existing facilities where existing physical constraints make it impractical to fully comply with new construction...
-
III-7.5115 Elevators and platform lifts
Elevators are required to serve each level in a newly constructed building, with four exceptions: 1) Exception 1 is the "elevator exemption" discussed above (see III−5.4000). 2) Exception...
-
Pit Toilet
Pit toilets are provided primarily for resource protection and are only constructed at recreation sites with a Recreation Site Development Scale level of 2 of less....
-
When alterations are made on an upper story of a facility, is vertical access required?
In any alteration, an accessible route between stories is not required in a facility that qualifies for those exceptions permitted in new construction based on the number of stories or square...
-
11B-216.4.1 Exit doors
An exit passageway is a horizontal exit component that is separated from the interior spaces of the building by fire-resistance-rated construction and that leads to the exit discharge or...
-
II-6.4000 Leased buildings
The availability of accessible private commercial space will steadily increase over time as the title III requirements for new construction and alterations take effect....
-
Door King Inc. 6400 In-Ground Gate Operators Video
Requires the Registered User plan or above. Login!