Where provided, weather shelters shall be designed and constructed so that a golf car can enter and exit the weather shelter and shall comply with Section 11B-1006.4....
Search Results "New Construction"
-
11B-238.2.3 Weather shelters
-
Q4.) Are conditions like door closers that require force in excess of the maximum allowed by the standards considered true tolerances or are they simply non-compliance with the maintenance requirements of 35.133 or 36.211?
In our opinion, the plain language of the term “Construction and Manufacturing Tolerances” does not include adjustable conditions that can meet the detailed requirements when properly maintained...
-
§ 36.304(d)(4)(iii)
(iii) Where an existing sauna or steam room was designed and constructed to seat only two people, it shall be exempt from the provisions of section 241 of the proposed standards....
-
Existing facility
Existing facility means a facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this part....
-
10.3.1(10)
(10) Stations shall not be designed or constructed so as to require persons with disabilities to board or alight from a vehicle at a location other than one used by the general public....
-
Existing facility
Existing facility means a facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this part....
-
11B-238.2.3 Weather shelters
Where provided, weather shelters shall be designed and constructed so that a golf car can enter and exit the weather shelter and shall comply with Section 11B-1006.4. ...
-
1.9.1.1.1
1.9.1.1.1 All buildings, structures, sidewalks, curbs and related facilities constructed in the state by the use of state, county or municipal funds, or the funds of any political subdivision...
-
11B-238.2.3 Weather shelters
Where provided, weather shelters shall be designed and constructed so that a golf car can enter and exit the weather shelter and shall comply with Section 11B-1006.4....
-
A.
Newport News controls....
- Valuta Waste Receptacles
-
Footnotes and Citations
Honeysett, AAM Philadelphia, April 30th 2009 Constantine, 2007 Tate Modern - http://www.tate.org.uk/modern/information/access.htm LACMA - http://www.lacma.org New York Hall of...
-
Public Entrances (Preamble, Section-by-Section Analysis)
- Generally, at least 50% of public entrances to new buildings must be accessible, rather than all entrances, as would often have resulted from the proposed approach....
-
Public entrances (Section-By-Section Analysis and Response to Comments)
- Generally, at least 50% of public entrances to new buildings must be accessible, rather than all entrances, as would often have resulted from the proposed approach....
-
§ 37.3 Remanufactured vehicle
Remanufactured vehicle means a vehicle which has been structurally restored and has had new or rebuilt major components installed to extend its service life....
-
101.1.2
101.1.2 All new or altered public buildings and facilities, private buildings and facilities, places of public accommodation, and commercial facilities subject to this code shall comply...
-
224 Transient Lodging Guest Rooms
1991 Standards for Accessible Design 2010 Standards for Accessible Design What’s New/Different Additional Requirements...
- SafePath SAFELIFT™ Platform Weightlifting Surface
-
Dwelling Unit
The fact that a condominium unit is sold before the completion of construction does not exempt a developer from compliance with the Act's accessibility requirements....
-
Resting Intervals [1018.8]
When the surface of the resting interval is constructed of asphalt, concrete, or boards, the slope of the resting interval must be no steeper than 1:48 (2 percent) in any direction....
-
1017.9 Protruding Objects
This section requires constructed elements on trails, resting intervals, and passing spaces to comply with the technical requirements for protruding objects in 307 of the Architectural Barriers...
-
F243.1 General
Where shooting facilities with firing positions are designed and constructed at a site, at least 5 percent, but no fewer than one, of each type of firing position shall comply with 1010....
-
Reconstruction
For the purposes of FSTAG, actions are categorized as construction, alteration, or maintenance....