(a) New construction and alterations subject to this part shall comply with the standards for accessible design published as appendix A to this part (ADAAG)....
Search Results "Pervious Construction"
Commonly Searched Documents
-
Sec.36.406(a)
-
Section 3. Fair Housing Act Design and Construction Requirements
This section reprints §100.205 (Design and Construction Requirements) from the Department's final rule implementing the Fair Housing Act....
-
New Construction. (Section-by-Section Analysis)
New Construction....
-
7.4.10.1 Outdoor Constructed Features
Where provided within trailheads each outdoor constructed features such as parking spaces, toilets, or camp sites shall comply with the applicable portions of the FSORAG and ABAAS....
-
§ 36.406(a)(2)
(2) New construction and alterations subject to §§ 36.401 or 36.402 shall comply either with the 1991 Standards or with the 2010 Standards if the date when the last application for a building...
-
4 - Best practices for construction observation
4 - Best practices for construction observation Construction observation is the final step in building an accessible element to meet design and regulatory requirements....
-
Noncomplying new construction and alterations. (Section-by-Section Analysis)
Noncomplying new construction and alterations....
- Lynx Grills Inc. 30” Grill ProSear Burner & 1 Stainless Steel Burner (L500ADA)
- Lynx Grills Inc. 36” Grill - 1 ProSear Burner & 2 Stainless Steel Burners (L600ADA)
-
Reconstruction
For the purposes of the FSORAG and FSTAG, actions are categorized as construction, alteration, or maintenance....
- Lynx Grills Inc. 36” Grill 1 ProSear Burner & 2 Stainless Steel Burners with Rotisserie (L600ADAR)
- Lynx Grills Inc. 30” Grill 1 ProSear Burner & 1 Stainless Steel Burner with Rotisserie (L500ADAR)
-
Structural Impracticability (Preamble, Section-by-Section Analysis)
It details a statutory exception to the new construction requirement: the requirement that new construction be accessible does not apply where an entity can demonstrate that it is structurally...
-
Structural Impracticability (Section-By-Section Analysis and Response to Comments)
It details a statutory exception to the new construction requirement: the requirement that new construction be accessible does not apply where an entity can demonstrate that it is structurally...
-
11B-201.1 Scope
All areas of newly designed and newly constructed buildings and facilities and altered portions of existing buildings and facilities shall comply with these requirements....
-
Work Areas (Section-By-Section Analysis and Response to Comments)
The preamble noted that the proposed paragraph provided guidance for new construction and alterations until more specific guidance was issued by the ATBCB and reflected in this Department's...
-
Compliance date
New construction under title II and alterations under either title II or title III had to comply with the design standards on that date....
-
1011.1 General
All outdoor constructed features shall comply with 1011.2 and 1011.3....
-
Section 36.401 New Construction (Preamble, Section-by-Section Analysis)
Section 36.401 New Construction General Section 36.401 implements the new construction requirements of the ADA....
-
1.9.1 Division of the State Architect - Access Compliance.
Temporary buildings and facilities are not of permanent construction but are extensively used or are essential for public use for a period of time....
-
68.102(a) Compliance with the Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way
(a) For public right-of-way projects, in addition to accepting compliance with applicable TAS requirements, the department will also accept compliance with the Proposed Accessibility...
-
1. New Curb Ramp Construction and Alterations
New Curb Ramp Construction and Alterations 36....
-
F201.1 Scope
All areas of newly designed and newly constructed buildings and facilities and altered or leased portions of existing buildings and facilities shall comply with these requirements....
-
IV. ALTERATIONS AND NEW CONSTRUCTION
Olympia shall provide written notice to the United States and the ILA that construction will be commenced on the Events Center on or before thirty (30) days from the date such construction...