Standby power shall be provided for platform lifts permitted by section 1003.2.13.4 of the International Building Code (2000 edition and 2001 Supplement) or section 1007.5 of the International...
Search Results "Standby Power"
-
207.2 Platform Lifts
-
1003.2.13.3 Elevators
Standby power shall be provided in accordance with Sections 2702 and 3003....
-
207.2 Platform Lifts
Standby power shall be provided for platform lifts permitted by section 1003.2.13.4 of the International Building Code (2000 edition and 2001 Supplement) or section 1007.5 of the International...
-
1007.4 Elevators
Standby power shall be provided in accordance with Sections 2702 and 3003....
-
207 Accessible Means of Egress
Standby power shall be provided for platform lifts permitted by section 1003.2.13.4 of the International Building Code (2000 edition and 2001 Supplement) or section 1007.5 of the International...
-
404.3.2 Maneuvering Clearance
Clearances at power-assisted doors and gates shall comply with 404.2.4....
-
404.3.6 Break Out Opening
Where doors and gates without standby power are a part of a means of egress, the clear break out opening at swinging or sliding doors and gates shall be 32 inches (815 mm) minimum when operated...
-
F207.2 Platform Lifts
Standby power shall be provided for platform lifts permitted by section 1003.2.13.4 of the International Building Code (2000 edition and 2001 Supplement) or section 1007.5 of the International...
-
1007.5 Platform lifts
Standby power shall be provided for platform lifts permitted to serve as part of a means of egress....
-
Full-Powered Automatic Doors and Gates [§404.3]
Full-Powered Automatic Doors and Gates [§404.3] Full-powered automatic doors and gates are often found in grocery and retail stores, hotels, and airports to ease passage with shopping...
-
Standby Power for Platform Lifts
Standby Power for Platform Lifts....
-
Automatic Door Break Out Openings
The 2010 Standards at sections 404.1, 404.3, 404.3.1, and 404.3.6 require automatic doors that are part of a means of egress and that do not have standby power to have a 32-inch minimum...
-
Maneuvering Clearance or Standby Power for Automatic Doors
Maneuvering Clearance or Standby Power for Automatic Doors. Section 4.13.6 of the 1991 Standards does not require maneuvering clearance at automatic doors....
-
404.3.2 Maneuvering Clearance
Clearances at power-assisted doors and gates shall comply with 404.2.4....
-
404.3.6 Break Out Opening
Where doors and gates without standby power are a part of a means of egress, the clear break out opening at swinging or sliding doors and gates shall be 32 inches (815 mm) minimum when operated...
-
Requirements for Platform Lifts
Platform Lift Clear Floor Space and Doors/ Gates
-
Elevators with Standby Power [IBC §1007.4 (2003), §1003.2.13.3 (2000)]
In buildings with four or more stories above or below the level of exit discharge, at least one accessible means of egress must be an elevator with standby power and emergency signaling...
-
Other Requirements in the ADA Standards
Platform Lifts Platform lifts, where permitted on an accessible means of egress, must have standby power (§207.2). ...
-
404.3.2 Maneuvering Clearance
Clearances at power-assisted doors and gates shall comply with 404.2.4....
-
404.3.6 Break Out Opening
Where doors and gates without standby power are a part of a means of egress, the clear break out opening at swinging or sliding doors and gates shall be 32 inches (815 mm) minimum when operated...
-
Platform Lifts: ADA Standard Section 207.2
Section 207.2 covers scoping requirements in the most current ADA Standards for platform lifts used as part of an accessible means of egress.
-
1009.4 Elevators
In order to be considered part of an accessible means of egress, an elevator shall comply with Sections 1009.4.1 and 1009.4.2.
-
1009.4 Elevators
In order to be considered part of an accessible means of egress, an elevator shall comply with Sections 1009.4.1 and 1009.4.2.
-
1009.4.1 Standby power
Standby power shall be provided in accordance with Chapter 27 and Section 3003....