See Dimensions D in the attached Sketches B and C. 505.10.3 Bottom Extension at Stairs At the bottom of a stair flight, handrails shall extend at the slope of the stair flight for...
Search Results "Sloped Sidewalk"
-
Where do I measure for a handrail extension?
-
b) Accessibility
Based on their inspections, Kirola's experts identified various access barriers, including an inaccessible entrance ramp at Balboa Park, a cracked sidewalk at Jefferson Square Park, limited...
-
H. Repairing and Rebuilding
Under UFAS, if an existing facility undergoes a “substantial alteration,” the public entity must provide (1) an accessible route from public transportation, parking, streets, and sidewalks...
-
Background:
Thus, where an element of a path of travel (such as a sidewalk, pedestrian ramp, passageway between platforms, staircase, escalator, etc.) in an existing facility is itself the subject of...
-
11B-101.1 General
Chapter 11B accessibility regulations are applicable to: 1) publicly funded buildings, structures, sidewalks, curbs and related facilities; 2) privately funded public accommodations and...
-
11B-101.1 General
Chapter 11B accessibility regulations are applicable to: 1) publicly funded buildings, structures, sidewalks, curbs and related facilities; 2) privately funded public accommodations and...
-
11B-101.1 General
Chapter 11B accessibility regulations are applicable to: 1) publicly funded buildings, structures, sidewalks, curbs and related facilities; 2) privately funded public accommodations and...
-
1. New Curb Ramp Construction and Alterations
The City has established Quality Assurance ("QA") Checklists for the design and construction of curb ramps and sidewalks to ensure they meet the applicable requirements and established quality...
-
Acceptable Trail Surfacing Requirements
surfaces are currently considered accessible only if the surfacing material is firm, stable, and slip-resistant and the trail has the engineered attributes of adequate width, moderately short slopes...
-
11B-604.3.2 Overlap
2-11B, dated 9/9/14, which includes the following interpretation of Subsection 11B-604.3.2: Showers are fixtures including a 30 inch x 60 inch clear receptor with a minimum/maximum slope...
-
11B-604.3.2 Overlap
2-11B, dated 9/9/14, which includes the following interpretation of Subsection 11B-604.3.2: Showers are fixtures including a 30 inch x 60 inch clear receptor with a minimum/maximum slope...
-
11B-809.8 Doors
., concrete, brick, flagstone) may have a maximum change in height from the interior landing of 1 inch (25 mm), provided a ramp with a maximum slope of 1:8 is permanently installed as illustrated...
-
1150A.1 General
Test No. 1 -- Individual Building Test may only be used if the site has terrain over 15 percent slope. Test No. 3 -- Unusual Characteristics Test may be used if applicable....
-
1003.3.2 Boarding Pier Clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
Data Collection Procedures
Potential causes for variation might be running and cross slope, a difference in drainage and/or adjacent runoff, and sun vs. shade location of reading locations....
-
Required Means of Egress [IBC §1007.1 (2003), §1003.2.13 (2000)]
The IBC (2003) permits one accessible means of egress from: wheelchair seating in assembly areas with sloped floors where the common path of travel meets aisle requirements for...
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp. ...
-
Study limitations
Another study researched the effect of cross-slopes on the mobility of manual wheelchair users and also reported the majority of their subjects having spinal cord injury followed by multiple...
-
Program Accessibility
For example, if there is not enough space to install a ramp with a slope no steeper than 1:12, a public entity may install a ramp with a slightly steeper slope....
-
Installation
Sites installed with EWF were found to have the highest SDS within the first year of installation including deficiencies with excessive running slope, cross slope and change in level. ...
-
Overview
original scope of work for this research project involved a longitudinal study that would examine the influence of five key variables: hydrology, climate, soil condition, grade and cross slope...
-
Accessibility - Flatness and Lippage
Concrete paving slabs: Laying pattern .. ..90 degree herringbone ..Stack bond or runningbond Slope in direction of travel All segmental concrete paving products...
- Envirobond Organic-Lock™ Surface Stabilizer
- Garaventa Evacu-Trac CD7 Evacuation Chair