Valet Parking and New Parking Garage (1) Defendants are currently in the process of constructing a new parking garage located on South Royal Street to the immediate south of the Hotel...
Search Results "Capital Construction Cost"
-
J. Valet Parking and New Parking Garage
-
Adaptability
Adaptability Toilet rooms designed for use by a single occupant of a specific space, can be designed to be "adaptable" so that accessible elements can be installed when needed after construction...
-
What Contributes to the Determination of "Readily Achievable"?
Nature and cost of the action II. Overall financial resources of the local site III. Number of persons employed IV. Effect on expenses and resources V....
-
11B-224.5 Dispersion
Factors to be considered in providing an equivalent range of options may include, but are not limited to, room size, bed size, cost, view, bathroom fixtures such as hot tubs and spas, smoking...
-
11B-224.5 Dispersion
Factors to be considered in providing an equivalent range of options may include, but are not limited to, room size, bed size, cost, view, bathroom fixtures such as hot tubs and spas, smoking...
-
11B-224.5 Dispersion
Factors to be considered in providing an equivalent range of options may include, but are not limited to, room size, bed size, cost, view, bathroom fixtures such as hot tubs and spas, smoking...
- Neo-Metro Ebb Concept - Wall Mounted Cast Resin Deck Featuring Ebb Basin
-
ADMINISTRATIVE AUTHORITY
[DSA-AC] A governmental agency that adopts or enforces regulations and guidelines for the design, construction, or alteration of buildings and facilities....
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....
-
4.3.11.1(4)
(4) A vestibule located immediately adjacent to an exit enclosure and constructed to the same fire-resistive standards as required for corridors and openings....
-
§100.205(e)(2)
(2) The following also qualify as HUD-recognized safe harbors for compliance with the Fair Housing Act design and construction requirements:...
-
13.14 Post-1993 Franchised Hotel
13.14 “Post-1993 Franchised Hotel” means a Franchised Hotel constructed for first occupancy after January 26, 1993....
-
13.17 Post-1993 Owned Hotel
13.17 “Post-1993 Owned Hotel” means an Owned Hotel constructed for first occupancy after January 26, 1993....
-
13.16 Post-1993 Managed Hotel
13.16 “Post-1993 Managed Hotel” means a Managed Hotel constructed for first occupancy after January 26, 1993....
-
§ 35.151(c)(4)
(4) For the purposes of this section, ceremonial groundbreaking or razing of structures prior to site preparation do not commence physical construction or alterations....
-
APPENDIX A
Excerpt from the MDE Advisory Committee Meeting Minutes, February 26 and 27, 2013:31 Manufacturer Presentations Several manufacturers presented information on technical and cost...
-
Water Closet Clearances
The Department gave careful consideration to the costs and benefits of its adoption of the standards relating to water closet clearances in single-user toilet rooms....
-
Water Closet Clearances
The Department gave careful consideration to the costs and benefits of its adoption of the standards relating to water closet clearances in single-user toilet rooms....
- Job Accommodation Network (JAN)
-
11B-202.3.2 Extent of application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction. ...
-
§ 35.151(i)(2)
(2) Newly constructed or altered street level pedestrian walkways must contain curb ramps at intersections to streets, roads, or highways....
-
§ 36.406(a)(4)
(4) For the purposes of this section, "start of physical construction or alterations" does not mean ceremonial groundbreaking or razing of structures prior to site preparation....
-
Scoping
Scoping—Specifications of where, when, and how much of constructed features detailed in the technical requirements must be met in order to be in compliance with the guidelines....
-
R202.2 Added Elements
Where elements are added to existing facilities, the added elements shall comply with the applicable requirements for new construction....