Administrative practice and procedure, Buildings and facilities, Civil rights, Communications, Individuals with disabilities, Reporting and recordkeeping requirements, State and local governments...
Search Results "Practice Teeing Ground"
Commonly Searched Documents
-
List of Subjects in 28 CFR part 35
-
§ 36.302(c)(1)
Generally, a public accommodation shall modify policies, practices, or procedures to permit the use of a service animal by an individual with a disability....
-
§ 38.111(b)(1)
Amend paragraph (b)(1) by removing the words “If physically and operationally practicable” and adding in their place the words “Unless structurally or operationally impracticable.”...
-
§ 38.111(b)(2)
Amend paragraph (b)(2) by removing the words “”not structurally or operationally practicable” and adding, in their place, the words “structurally or operationally impracticable”....
-
§ 38.91(c)(2)
Amend paragraph (c)(2) by removing the words “not structurally or operationally practicable” and adding, in their place, the words “structurally or operationally impracticable”....
-
Sec.36.302(c)(1) General
Generally, a public accommodation shall modify policies, practices, or procedures to permit the use of a service animal by an individual with a disability....
-
§100.85(b)
(b) In establishing a discriminatory housing practice under this section it is not necessary that there was in fact profit as long as profit was a factor for engaging in the blockbusting...
-
§ 35.136(a) General
Generally, a public entity shall modify its policies, practices, or procedures to permit the use of a service animal by an individual with a disability....
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....
-
605.3 Clear Floor Space
A clear floor or ground space complying with 305 positioned for forward approach shall be provided....
-
602.4 Spout Height
Spout outlets shall be 36 inches (915 mm) maximum above the finish floor or ground....
-
305.4 Knee and Toe Clearance
Unless otherwise specified, clear floor or ground space shall be permitted to include knee and toe clearance complying with 306....
-
4.2.4 Height of Fire-Building Surface
The fire-building surface within a fire ring shall be at least 9 inches (230 mm) above the floor or ground....
-
4.32.4* HEIGHT OF WORK SURFACES
The tops of tables and work surfaces shall be from 28 in to 34 in (710 mm to 865 mm) from the floor or ground....
- Feeling Safe, Being Safe Webcast Training: Being Prepared
- Feeling Safe, Being Safe Webcast Training: The Emergency Worksheet
- Feeling Safe, Being Safe Webcast Training: Introduction & Materials
- Feeling Safe, Being Safe Webcast Training: The Emergency Kit
- Feeling Safe, Being Safe Webcast Training: Community Supports
- Structured Negotiation: A Winning Alternative to Lawsuits
-
11B-803.5 Coat hooks and shelves
Shelves shall be 40 inches (1016 mm) minimum and 48 inches (1219 mm) maximum above the finish floor or ground....
-
11B-405.9.2 Curb or barrier
minimum, or barrier shall be provided that prevents the passage of a 4 inch (102 mm) diameter sphere, where any portion of the sphere is within 4 inches (102 mm) of the finish floor or ground...
-
11B-803.5 Coat hooks and shelves
Shelves shall be 40 inches (1016 mm) minimum and 48 inches (1219 mm) maximum above the finish floor or ground....
-
§382.3 Equivalent alternative
Equivalent alternative means a policy, practice, or other accommodation that provides substantially equivalent accessibility to passengers with disabilities, compared to compliance with...