A digital level can be used to measure the running slope and cross slope....
Search Results "Rail Crossing"
-
4. Assess During the Planning, Installation and Maintenance Phases
-
Running Slope of Ramps Deployed to Roadways or Curb-Height Bus Stops
A 1:6 maximum for non-rail vehicle ramp slopes, in their view, was safer and more in line with current technology....
-
217 Telephones
on public telephones (217.3) clarifying the application of TTY scoping requirements to exterior sites (217.4.4) incorporating requirements for transportation facilities, including rail...
-
8. Transportation Vehicles
The guidelines, which the Board originally published in 1991, apply to new or remanufactured vehicles (they also include provisions for rail vehicles that the Board will update separately...
-
8. Transportation Vehicles
The guidelines, which the Board originally published in 1991, apply to new or remanufactured vehicles (they also include provisions for rail vehicles that the Board will update separately...
-
Handrails [4.8.5]
This clearance allows space for knuckles while preventing entrapment for people who lean on rails with their forearm....
-
Fares
The system operates the same regardless of whether the paratransit trip is being provided in place of a bus or a rail trip the user cannot make on the fixed route system....
-
Expert Report of John Rife Torkelson, theACCESSpartnership, L.P. (August 8, 2018)
Sidewalks & Walkways: The cross slope in the designated accessible route exceeds the maximum slope allowed of 1:48 (1991 ADA Stds 4.3.7; 2010 ADA Stds 403.3)....
- Disability Resource Center (dRC) - Fredericksburg, VA
- GameTime Roller Slide
- Sizewise Bari Rehab Platform2 Bariatric Hospital Bed
- Horton Automatics ICU/CCU Bi-Fold/Bi-Swing™ Door System
- AJW Architectural Products U136EA 54 oz. Automatic Liquid Soap Dispenser - Vanity Mounted
- Armor-Tile Tactile Systems Cast In Place Detectable Warning Surface System
- Mobility International USA (MIUSA)
-
Transfer Supports Location and Configuration M301.3 and M302.3
The shape (contours and curves along length for ergonomics, not cross sectional profile) was kept open to give manufacture flexibility in the design as the direction of positioning (i.e....
-
Temporary Solutions For Emergency Sheltering - Ramps
Problem: The accessible route crosses a curb but no curb ramp is provided. Suggestion: Install a portable ramp with a slope no steeper than 1:12 with edge protection....
-
B) Accessible Route
route must be at least 36 inches wide, have no abrupt vertical changes in level (such as a step), have a running slope no more than 1:12 in most cases, and meet other requirements for cross...
-
7.2.2.1 Determining Impracticability
The combination of trail running slope (grade) and cross slope exceeds 1:2.5 (40 percent) for over a distance of 20 feet (6m). Limiting Factor 2. ...
-
Instrumentation for Analysis
An on-site inspection form (Appendix C) was created to collect information on the nine locations identifying deficiencies in slope, cross slope, changes in level and openings in the surface...
-
Some existing measurement protocols
There is also no accepted standard method for using a digital inclinometer, lasers, or other surveying equipment to measure ramp slope and cross slope....
-
Changes in Level at Entry to Wheelchair Spaces (M303.3)
Ramp runs would be required to have a running slope not steeper than 1:12 and a cross slope not steeper than 1:48....
-
Alterations to Existing Facilities
For example, if a new bench is installed on a sidewalk that has a cross slope exceeding 2 percent, the sidewalk is not required to be altered to reduce the cross slope because the bench...
-
Soiltac Powder Mix-In
Where there was water flow crossing the segment, the surface was soft under foot but returned to a natural surface state....