Within three (3) months of the entry of this Consent Decree, the County will ensure that each of its 911 consoles or call stations can receive and respond to TTY communications effectively...
Search Results "Ramped Entry"
Commonly Searched Documents
-
G. 911 EMERGENCY COMMUNICATIONS
-
17. Modifications to be completed within one year
Modifications to be completed within one year: As agreed between the parties, within one year of the date of entry of this Consent Decree, Defendants shall make the following physical, operational...
-
7.4 Security Bollards
An alternate entry that is equally convenient to that provided for the ambulatory population is acceptable....
-
7.4 SECURITY BOLLARDS
An alternate entry that is equally convenient to that provided for the ambulatory population is acceptable....
-
§ 37.3 Light rail
Service may be provided by step-entry vehicles or by level boarding....
-
11B-101.2 Reserved.
On or after January 31, 2013 For existing pools, wading pools, and spas built before March 15, 2012, elements that do not comply with the supplemental requirements for entry...
-
§382.99(a)
carrier, you must negotiate in good faith with the airport operator of each U.S. airport described in §382.95(b) to ensure the provision of lifts for boarding and deplaning where level-entry...
-
1009 Swimming Pools, Wading Pools, and Spas
Specifications are provided for various means of providing pool access, including pool lifts, sloped entries, transfer walls, transfer systems, and stairs....
-
406.8 Detectable Warnings
The detectable warning shall extend the full width of the curb ramp (exclusive of flared sides) and shall extend either the full depth of the curb ramp or 24 inches (610 mm) deep minimum...
-
Are screen doors or storm doors considered “doors in series”?
No, screen or storm doors are not considered “doors in series” since they are part of the same doorway opening as the entry door....
-
11B-1002.4.3 Gaps
Exception: Where compliance is not operationally or structurally feasible, ramps, bridge plates, or similar devices complying with the applicable requirements of 36 CFR 1192.83(c) shall...
-
ASME A18.1 Safety Standard [§410.1]
Under the ADA Standards, platform lifts must be independently operable and must allow unassisted entry and exit from the lift....
- Armor-Tile Tactile Systems Surface Applied Systems
-
Catch Pools
An accessible means of entry or exit is not required into the catch pool. However, an accessible route must connect to the edge of the catch pool....
-
2.3 Restrooms
Is the entry door at least 32 inches wide?...
-
1018.2 Connections
This section requires beach access routes to connect an entry point to the beach to the high tide level at tidal beaches; mean high water level at river beaches; and normal recreation water...
-
Door and Signal Timing: ADA Standard Section 407.3.4
Section 407.3.4 covers the current ADA Standards for door and signal timing of elevator reopening devices.
-
11B-809.8.3 Door maneuvering clearance.
At the dwelling unit side of the primary entry doors, secondary exterior doors, and required exit doors maneuvering clearances shall be 44 inches (1118 mm) minimum in length measured...
-
R409.3 Continuity
Handrails shall be continuous within the full length of each ramp run or stair flight....
-
H. LAW ENFORCEMENT AND EFFECTIVE COMMUNICATION
Within three (3) months of the entry of this Consent Decree, the County will implement the Humboldt County Sheriff’s Office’s Policy Statement on Effective Communication with People...
-
H. LAW ENFORCEMENT AND EFFECTIVE COMMUNICATION
Within three (3) months of the entry of this Consent Decree, the County will implement the Humboldt County Sheriff’s Office’s Policy Statement on Effective Communication with People Who...
-
F105.2.2 ASME
standard includes additional provisions for runway enclosures, electrical equipment and wiring, structural support, headroom clearance (which is 80 inches minimum), lower level access ramps...
-
QUESTION: WHAT DOES THE RULE MEAN BY “EXISTING FREIGHT OPERATIONS?”
track adjacent to the new or altered passenger platform via a gauntlet or other available track such that the freight train does not need to use the track adjacent to the platform, level-entry...