[See subsections ...]
Search Results "Future Construction Theaters"
-
§ 37.42 Service in an Integrated Setting to Passengers at Intercity, Commuter, and High-Speed Rail Station Platforms Constructed or Altered After February 1, 2012
-
§ 37.42 Service in an Integrated Setting to Passengers at Intercity, Commuter, and High-Speed Rail Station Platforms Constructed or Altered After February 1, 2012
[76 FR 57935, Sept. 19, 2011]
-
Trailheads
To comply with the ABA and Section 504 of the Rehabilitation Act of 1973, ensure that each constructed feature provided at a trailhead complies with the applicable provisions of FSORAG and...
-
II-6.3100 General principles
ADAAG: Contains a structural impracticability exception for new construction: full compliance with the new construction standards is not required in the rare case where the terrain prevents...
-
Q7: Curb Ramp for a Sidewalk that is Not Made of Concrete or Asphalt
A "prepared surface for pedestrian use" can be constructed out of numerous materials, including concrete, asphalt, compacted soil, decomposed granite, and other materials. ...
-
J. Valet Parking and New Parking Garage
Valet Parking and New Parking Garage (1) Defendants are currently in the process of constructing a new parking garage located on South Royal Street to the immediate south of the Hotel...
-
Adaptability
Adaptability Toilet rooms designed for use by a single occupant of a specific space, can be designed to be "adaptable" so that accessible elements can be installed when needed after construction...
-
New Requirements for Assistive Listening Systems (ALS)
over 55 plus 1 per 100 seats over 2000 seats or fraction thereof 1 per 4 receivers or fraction thereof EXAMPLE Theater...
-
ADMINISTRATIVE AUTHORITY
[DSA-AC] A governmental agency that adopts or enforces regulations and guidelines for the design, construction, or alteration of buildings and facilities....
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....
-
4.3.11.1(4)
(4) A vestibule located immediately adjacent to an exit enclosure and constructed to the same fire-resistive standards as required for corridors and openings....
-
§100.205(e)(2)
(2) The following also qualify as HUD-recognized safe harbors for compliance with the Fair Housing Act design and construction requirements:...
-
13.14 Post-1993 Franchised Hotel
13.14 “Post-1993 Franchised Hotel” means a Franchised Hotel constructed for first occupancy after January 26, 1993....
-
13.17 Post-1993 Owned Hotel
13.17 “Post-1993 Owned Hotel” means an Owned Hotel constructed for first occupancy after January 26, 1993....
-
13.16 Post-1993 Managed Hotel
13.16 “Post-1993 Managed Hotel” means a Managed Hotel constructed for first occupancy after January 26, 1993....
-
§ 35.151(c)(4)
(4) For the purposes of this section, ceremonial groundbreaking or razing of structures prior to site preparation do not commence physical construction or alterations....
-
DEFINITIONS
The broad construction of this term also includes (but is not limited to) individuals seeking to communicate with representatives of MSHA regarding past, present or future health care services...
-
3. The Release Provisions are Overbroad
Plaintiffs nor any Class member will hereafter assert or claim that Settling Defendant is required to make additional or different modifications ...or ... follow different standards for Future...
-
11B-202.3.2 Extent of application
An alteration of an existing element, space, or area of a building or facility shall not impose a requirement for accessibility greater than required for new construction. ...
-
§ 35.151(i)(2)
(2) Newly constructed or altered street level pedestrian walkways must contain curb ramps at intersections to streets, roads, or highways....
-
§ 36.406(a)(4)
(4) For the purposes of this section, "start of physical construction or alterations" does not mean ceremonial groundbreaking or razing of structures prior to site preparation....
-
Scoping
Scoping—Specifications of where, when, and how much of constructed features detailed in the technical requirements must be met in order to be in compliance with the guidelines....
-
R202.2 Added Elements
Where elements are added to existing facilities, the added elements shall comply with the applicable requirements for new construction....
-
6.2 Where Required
Beach access routes shall be provided in a number complying with 6.3 where any of the following facilities to serve the beach are constructed or altered: ...