Document: 484 pages (9.30 MB PDF) Publication Date: September 2001 This guidebook is the second part of a two-phase project focused on designing sidewalks and trails for access....
Search Results "Horizontal Projection"
- Designing Sidewalks and Trails for Access, Part II of II: Best Practices Design Guide
-
Background
As a rule, the Building Code requirements that are applicable are the ones that were in effect when the project was permitted....
- Rebuilding Together Houston - Houston, TX
-
11B-206.2.1 Site arrival points
For projects subject to HUD Section 504 Regulations Exception 2 is not permitted....
-
11B-202.4 Path of travel requirements in alterations, additions and structural repairs
Additions or alterations to meet accessibility requirements consisting of one or more of the following items shall be limited to the actual scope of work of the project and shall not be...
- ThinkWork
- TownSteel ED5500F Grade 1 Fire Rim Device
- Bobrick Reversible Folding Shower Seat B-5181
- BTX Intelligent Fashion Futura Drapery System
- Smith System Trespa Planner Science Table 48″ Deep
- American Safety Tread Co., Inc. Type T-24H Contrasting Stripe
- Rebuilding Together Broward County - Oakland Park, FL
- Paths to Employment Resource Center
- METechs Remote Operated Drapery Installation Video
-
11B-1003.3.1 Boat slip clearance
However, where mooring systems for floating piers are replaced as part of pier alteration projects, an opportunity may exist for increasing accessibility....
-
1133B.2.3.2
except Group I, Division 1 occupancies, or where the occupant load is greater than 10 and it is determined that compliance with Section 1133B.2.3 would create an unreasonable hardship, a projection...
-
1003.3.1 Boat Slip Clearance
However, where mooring systems for floating piers are replaced as part of pier alteration projects, an opportunity may exist for increasing accessibility....
-
11B-206.4.10 Medical care and long-term care facilities
For existing buildings that do not have a protected accessible entrance, projects subject to Section 11B-202 are not required to provide one. ...
-
6.2 PV Systems at Existing Parking Facilities
Existing facility does not have accessible parking – If the elements listed in 6.1 above are not fully accessible, the scope of the project must include upgrades to bring them into compliance...
-
Raised and Brailled Characters and Pictorial Symbol Signs [4.30.4]
It is important that the vertical projection of dots be rounded, not straight (i.e., mounds, not cylinders)....
-
A4.5.1 General
A research project sponsored by the Architectural and Transportation Barriers Compliance Board (Access Board) conducted tests with persons with disabilities and concluded that a higher coefficient...
-
About the Authors
Kathleen Snodgrass came to the Missoula Technology and Development Center (MTDC) as a project leader in 2001 She began her career with the Forest Service at the Nez Perce National Forest...
-
4.1.3(5)*
access to incidental occupiable spaces and rooms which are not open to the general public and which house no more than five persons, including but not limited to equipment control rooms and projection...
-
Selection of Trail Surface Materials
Selection of Trail Surface Materials A review of trail surfacing products conducted for this project identified approximately 80 different trail surface materials that promoted providing...