Word Fillable Form (0.7MB) Word Non-Fillable Form (0.7MB) PDF Non-Fillable Form (0.5MB)
Search Results "Survey Tool"
Commonly Searched Documents
-
Golf Facilities
-
11 [§ 4.7.6]
11 [§ 4.7.6] A built-up curb ramp typically consists of asphalt or concrete that is poured and shaped into a ramp that runs at a 90-degree angle away from an intact curb down to...
-
12 [§ 4.7.9]
12 [§ 4.7.9] When a curb ramp is located at a marked crossing, the area where the ramp run ends must be contained within the marked crossing. The flared sides of a curb ramp do...
-
8 [§§ 4.3.3; 4.3.7]
8 [§§ 4.3.3; 4.3.7] Curb ramps should have at least 36 inches of clear space at the “top” of the ramp, which can be seen in the illustration to the right [below]. The 36-inch...
- Bosch 3 Point Self Leveling Alignment Laser Level GPL 3 S
- Bosch 3-Point Self-Leveling Alignment Laser GPL 3
-
CASI 2014 Summer Training
CASI 2014 Summer Training
-
Part 2: Tools for Surveys
The tools necessary to conduct surveys using the 2016 Checklist are inexpensive and many, if not all, can be purchased at local hardware and home improvement stores....
-
Door Opening Force
Door Opening Force If you’re using a door pressure gauge, place it where you would push open the door. If you’re using a fish scale, place it...
-
9.b [§ 4.7.5]
9.b [§ 4.7.5] If the sidewalk at the top of the ramp (“x”) is less than 48 inches wide and the curb ramp you are surveying has flared sides, answer this question....
-
Amusement Rides
Word Fillable Form (0.8MB) Word Non-Fillable Form (0.7MB) PDF Non-Fillable Form (0.5MB)
-
Re: Husky 24" Line Generator Digital Laser Level
See Bill Hecker, AIA, Kirola vs City and County of San Francisco, Expert for DOJ, testimony with regards to Laser level lengths.
- ADA Pro App: how to use ADA Pro v1
- Introducing ADA Pro and ADA Veracity, mobile inspection suite
- Title II ADA Requirements Software BlueDAG
-
I. Ensuring Compliance Now and In the Future
To survey curb ramps in your community, use the Curb Ramps survey form and instructions that will be included in the Appendices to this Tool Kit, which will be released soon. ...
-
Re: How to Use the Pressure Gauge Tool
Whichever type of tool you use, try to find a way to verify that it's accurate....
-
Step 6 - Develop a Transition Plan
The transition plan is developed from the self-evaluation and facilities survey....
-
Physical Access
Resources found at http://www.hfcdihp.org/products.html Choosing and Negotiating an Accessible Facility Location Improving Accessibility with Limited...
-
18(b)
(b) Before any Newly Constructed Hotel is open to the public after the Effective Date, HWI will require the hotel owner to provide a certification from an architect that includes the...
- Bosch Five-Point Self-Leveling Alignment Laser GPL 5 S
- Starodub, Inc. Ultra-Light Inertial Profiler (ULIP) for Sidewalks
- Overview of BlueDAG's Evaluation Suite
-
Monitoring and Fees
Monitoring and Fees – During the first five years of the Compliance Period, Plaintiffs may conduct semi-annual inspections of the City’s drawings and/or designs regarding the...