conducted research to address some timely and critical human factors issues in boarding vehicles and develop key accessible information technology resources for improving usability of transit...
Search Results "Zero Curb Transition"
Commonly Searched Documents
- Rehabilitation Engineering Research Center on Accessible Public Transportation
-
Typical Day One - Basic Facilities Requirements
Compliance Strategies (30 - 60 minutes) Strategy suggestions, self-evaluation and transition plans, leases and contracts, barrier removal, alterations, and suggestions for new construction...
-
What other considerations are significant for persons with disabilities?
ADAAG also contains provisions that limit surface discontinuities along an accessible route, including elevator cab leveling tolerances at landings, gaps between car and platform in transit...
-
Architectural Barriers Act
8The Architectural Barriers Act also covers facilities constructed, altered, or leased by federal agencies; and facilities constructed or altered by the Washington Metropolitan Area Transit...
-
5. PLAN INCLUSIVELY
residents; partnerships with homeless shelters and programs; donations of certain medical/assistive equipment Transport and Access MTA Access-a-Ride; other special needs transit...
-
Handrails
Curb ramps are not subject to handrail requirements....
-
Q2.) What are the types of “field conditions” that were anticipated where the advisory says “tolerances recognized by this provision include those for field conditions”?
And a concrete finisher clearly cannot guarantee that the slope of a concrete curb ramp will be consistently 8.33% across its entire surface. ...
-
A. Exterior Routes
.: sidewalks and walkways), are there no steps, no abrupt level changes over 1/4", and no unramped curbs that will impede access for persons who use wheelchairs, walkers and other mobility...
-
New Construction
Examples Single occupant structures accessed only by passageways below grade or elevated above standard curb height, such as toll booths that are accessed only by underground tunnels...
-
1.7 Procedure
If the participant did not see the detectable warning from 2.4 m (8 ft), a conspicuity rating of zero was assigned by the experimenter....
-
2.6 Conspicuity Ratings
A rating of zero (or “X” in the figures below) was assigned by the experimenter to those detectable warnings that were not detected from the viewing distance of 2.44 m (8 ft)....
-
Expert Report of Ken Schoonover, P.E., KMS Associates, Inc. (August 7, 2018)
Sidewalks & Walkways: The curb ramp slope is greater than 1:12 (1991 ADA Stds 4.7.2, 4.8.2; 2010 ADA Stds 405.2, 406.1)....
-
Attachment I: Program Access in Existing Facilities
Attachment I: Program Access in Existing Facilities
-
Issue 8: What are the top issues for developing design guidance (i.e., Lowhanging fruit design issues)?
We’ve got a huge change – sea change with regard to Zero Net Energy (ZNE) buildings. Right....
- LaCantina Contemporary Clad Door System
- LaCantina Aluminum Wood Door System
-
7.12 Nondiscrimination in Other Benefits and Privileges of Employment
This includes transportation between employer facilities, transportation to or from mass transit and transportation provided on a occasional basis to employer-sponsored events....
-
When is a historic structure considered accessible?
The work required to provide the alternative program experience was identified in the accessibility transition plan for that facility. Construction was completed....
-
ADA Task Force Meeting Topics (Public Entity)
Assistance" Review Policies for Licenses and Appointments Review Procurement Criteria and Procedures Survey of Facility Barriers Review Streets and Walkways under Control of Entity Transition...
-
T403 Lifts
Several commenters, including transit operators and a bus manufacturer, expressed concern with certain aspects of these proposed technical provisions, including specifications for interior...
-
ADA+ Facilities Compliance Services
negotiations, and mediation or providing expert witness testimony Development of comprehensive self-evaluations of programs, services, activities and benefits Development of transition...
-
1.1.4 Walk cross slope
Alternately, a surveyor's transit or other electronic surveying tool may be used if it meets the accuracy requirements of 1.1.1....
-
Section 37.33 Airport Transportation Systems
When a regular urban mass transit system serves the airport, the airport is simply one portion of its service area, treated for purposes of this rule like the rest of its service area....
-
1124B
Ground and floor surfaces along accessible routes and in accessible rooms and spaces, including floors, walks, ramps, stairs and curb ramps, shall be stable, firm, slip resistant and shall...