In fact, one of the easiest ways to avoid problems is to design construction elements that take the reality of construction tolerances into account....
Search Results "Capital Construction Cost"
-
Suggested best practices for architects and other design professionals
-
The Advance Notice of Proposed Rulemaking
under the guidance provided in OMB Circular A-4, http://www.whitehouse.gov/omb/circulars/a004/a-4.pdf, Sections D (Analytical Approaches) and E (Identifying and Measuring Benefits and Costs...
-
Consideration
In consideration of the mutual promises contained in this Agreement, good and valuable consideration, the receipt and sufficiency of which is acknowledged, and to avoid the costs,...
-
Consideration
In consideration of the mutual promises contained in this Agreement, good and valuable consideration, the receipt and sufficiency of which is acknowledged, and to avoid the costs,...
-
STRUCTURAL IMPRACTICABILITY
Changes having little likelihood of being accomplished without removing or altering a load-bearing structural member and/or incurring an increased cost of 50 percent or more of the value...
-
Executive Order 12866
The Board has analyzed the benefits and costs of the rule and has determined that it is not likely to have an annual effect on the economy of $100 million or more, or adversely affect in...
-
19. Under what circumstances may a school district use IDEA funds to pay for auxiliary aids or services for IDEA‐eligible students to ensure effective communication as required by Title II?
The IDEA provides that grant funds must be used only in accordance with the applicable provisions of the IDEA and to pay the excess costs of providing special education and related services...
-
1.4.2. Minimum Scoping Requirements for Captioning and Audio Description Devices
The Final RA uses these scoping requirements to estimate the costs of the final rule, as presented in Section 3.3.3. ...
-
When an addition increases the number of stories or square footage beyond the maximum permitted by the exception, is an accessible route between stories required?
includes a primary function area, an accessible path of travel to the primary function area is required, including where it involves travel between stories or levels, to the extent the cost...
-
SUMMARY OF THE 19-INCH RECOMMENDATION
to hospitals, physicians, and other health care providers of replacing or modifying existing equipment together with manufacturer costs of redesigning equipment Carefully balance...
-
4.2 Applications of Findings in Design and Standards Development
Also, the changes required are often minimal and the cost is usually only a small percentage of total building costs, if any....
-
ADOPTION AND IMPLEMENTATION OF EFFECTIVE COMMUNICATION POLICY
The heading on the posted Effective Communication Policy shall be printed in capital letters in a bold font no smaller than 26 points....
-
Effective date: Triggering event. (Section-by-Section Analysis)
Using the start of construction as the triggering event would harmonize title III's requirements for new construction with the requirements for new construction and alterations under title...
-
6. Recognize that Proper Installation of Play Surface Systems is Key
At this site, the playground equipment and surface system will be installed by a contractor specializing in playground construction....
-
11B-504.3 Open risers
On exterior stairways, risers constructed of grating containing openings of not more than ½ inch (12.7 mm) may be permitted....
-
11B-504.3 Open risers
On exterior stairways, risers constructed of grating containing openings of not more than ½ inch (12.7 mm) may be permitted....
- The Accessibility Management Platform (AMP)
-
Facilities Not Specializing in Treating Conditions That Affect Mobility: ADA Standard Section 223.2.1
Section 223.2.1 covers scoping requirements in the current ADA Standards for facilities not specializing in treating conditions that affect mobility.
-
Triggering event. (Section-by-Section Analysis)
In the NPRM, the Department proposed using the start of physical construction as the triggering event for applying the proposed standards to new construction under title III....
- Roadtech Manufacturing Retractable Cone Bar Barricades and Barriers
- Rebuilding Together Silicon Valley - San Jose, CA
-
12185(a)(2)
(2) the most cost-effective methods for providing access to over-the-road buses and over-the-road bus service to individuals with disabilities, particularly individuals who use wheelchairs...
-
Triggering event
In Sec. 35.151(c)(2) of the NPRM, the Department proposed that the commencement of construction serve as the triggering event for applying the proposed standards to new construction and...