Potential causes for variation might be running and cross slope, a difference in drainage and/or adjacent runoff, and sun vs. shade location of reading locations....
Search Results "Slope"
Commonly Searched Documents
-
Data Collection Procedures
-
Required Means of Egress [IBC §1007.1 (2003), §1003.2.13 (2000)]
The IBC (2003) permits one accessible means of egress from: wheelchair seating in assembly areas with sloped floors where the common path of travel meets aisle requirements for...
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp. ...
-
FIGURE INDEX
Gates in Series Figure 405.7 Ramp Landings Figure 405.9.1 Extended Floor or Ground Surface Edge Protection Figure 405.9.2 Curb or Barrier Edge Protection Figure 406.2 Counter Slope...
-
Swimming pools, wading pools, saunas, and steam rooms. (Section-by-Section Analysis)
Most commenters stated that installing a sloped entry in an existing wading pool is not likely to be feasible....
- Envirobond Organic-Lock™ Surface Stabilizer
- Garaventa Evacu-Trac CD7 Evacuation Chair
-
810 Transportation Facilities
The Board has explicitly specified that rail platforms shall slope no more than 1:48 in any direction, consistent with cross slope provisions for walking surfaces in section 403....
-
G. Completing the Survey and Checklist
The accessible route is a continuous unobstructed pedestrian path without steps or steep slopes that connects all accessible site and building features and spaces together....
-
Installation of Test Surfaces
All roots, stones, and vegetation were removed. 2) Place a diversion along the slope above the test area to assure no direct site drainage into the surfaced area. 3) Cover entire subgrade...
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp. ◼...
-
Roughness Calculation
The slopes of the linear trend lines show that as surface roughness increased, average RMS accelerations consequently increased....
-
General Exceptions in FSTAG
Access Board for identifying when extreme environmental barriers may exempt an entire trail from technical accessibility requirements: A combination of running slope and cross slope...
-
240.2.1 Ground Level Play Components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
11B-240.2.1 Ground level play components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
Feature 2 - Routes to the Building Entrance
Abrupt level changes, steps, or steeply sloped sidewalks cannot be part of an accessible route. Where ramps are used, they cannot be steeper than 1:12 (8.33% incline)....
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
Issue: Curb Ramps
Likewise, when new sidewalks or walkways are built or altered, they must contain curb ramps or sloped areas wherever they intersect with streets or roads....
-
1003.3.2 Boarding Pier Clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
F240.2.1 Ground Level Play Components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
240.2.1 Ground Level Play Components
Where possible, designers and operators are encouraged to provide ramps with a slope less than the 1:12 maximum....
-
CCDA Accessibility Checklist for Building Inspectors, 2015 Edition
The trained building code official/building inspector must assess the elevations and slopes of the existing streets and sidewalks, location of existing buildings, existing drainage and other...
-
1003.3.2 Boarding Pier Clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
Standard Stall
Where floor drains are provided, they should be located or otherwise designed (trench drains) so that the floor surface in accessible stalls is level since slopes greater than 2% and drain...