When beach access routes are constructed of asphalt, concrete, or boards, the cross slope must be no steeper than 1:48 (2 percent)....
Search Results "Completion of Construction"
Commonly Searched Documents
-
Cross Slope [1018.7.2]
-
206.5 Doors, Doorways, and Gates
Barriers at common or emergency entrances and exits of business establishments conducting business with the general public that are existing, under construction, or under contract for construction...
-
1018.9 Protruding Objects
Constructed elements on beach access routes and resting intervals shall comply with 307. Advisory 1018.9 Protruding Objects....
-
1018.9 Protruding Objects
This section requires constructed elements on beach access routes and resting intervals to comply with the technical requirements for protruding objects in 307 of the Architectural Barriers...
-
1017.9 Protruding Objects
Constructed elements on trails, passing spaces, and resting intervals shall comply with 307. Advisory 1017.9 Protruding Objects....
-
Additions [§202.2]
or extend a facility’s gross floor area or height of a facility are considered additions (as defined in §106.5) and must comply with the requirements of the standards applicable to new construction...
-
§ 38.71(b)(1)
(1) Vehicles intended to be operated solely in light rail systems confined entirely to a dedicated right-of-way, and for which all stations or stops are designed and constructed for revenue...
- GAP ARMOUR
-
VIII. MONITORING
Within six (6) months from the date of entry of this Consent Decree, or upon the completion of the alterations required by this Consent Decree, whichever is earlier, Defendants shall allow...
-
§ 382.53 Medical certificates
incubator; (ii) Who needs medical oxygen during a flight, as provided in 14 CFR 121.574; or (iii) Whose medical condition is such that there is reasonable doubt that the individual can complete...
-
Use of Mandatory Language in Proposed Guidelines
The other federal agencies will establish the effective dates for compliance with the accessibility standards when they complete their rulemakings....
-
Durability and Maintenance of Detectable Warning Surfaces (Section-by-Section Analysis)
The first study was completed in 2005 and reviewed performance information submitted by state and local transportation departments.33 The performance information was limited in terms of...
-
3.3.13 360-Degree Turn
Less than 50% of our manual and powered wheelchair users completed a 360-degree turn within the United States standard turning diameter (Figure 3‒12)....
-
E207.2 WCAG Conformance (Section-by-Section Analysis)
For a more complete discussion of WCAG conformance requirements in the proposed rule, see the discussion in Section IV.E.2 (Rulemaking History – 2010 and 2011 ANPRMs: Significant Issues...
-
D. Tools Needed
If you are not familiar with taking the types of measurements needed to complete the checklist, review the following section and practice using the tools before going to conduct a survey...
-
§35.150(d)(1)
accessibility, a public entity that employs 50 or more persons shall develop, within six months of the effective date of this part, a transition plan setting forth the steps necessary to complete...
-
16(j)
(j) The ADA Consultant shall continue to perform the inspections and monitoring described in subparagraphs 16(g) and (h) (to the extent surveys are submitted or plans completed later than...
-
§ 35.150(d)(1)
achieve program accessibility, a public entity that employs 50 or more persons shall develop, within six months of January 26, 1992, a transition plan setting forth the steps necessary to complete...
-
11B-707.5.2 Receipts
Where receipts are provided, speech output devices shall provide audible balance inquiry information, error messages, and all other information on the printed receipt necessary to complete...
-
Functional Homes: Universal Design for Accessibility Blog
Functional Homes: Universal Design for Accessibility Universal/accessible design from an occupational therapy and a construction perspective....
-
4.3 Periodic Reviews.
)(v) requires airports to establish a system for periodically reviewing and updating the self-evaluation required by paragraph (c)(2) of that Section. 28 CFR § 35.151 requires that new construction...
-
Cross Slope [1016.7.2]
When the surface is constructed of concrete, asphalt, or boards, the cross slope must be no steeper than 1:48 (2 percent)....
-
Building Guidelines and Standards are needed for Accommodations of Low Vision Persons
building’s configuration, details and siting to take best advantage of solar orientation to make that building effective as a building as well as it’s beautiful in its architecture and construction...
-
Industry Standards
ACI 117-2010 Standard Specifications for Tolerances for Concrete Construction and Materials ASTM E 380 Standard Practice for the Use of the International...