DOT also requires detectable warnings on curb ramps in projects funded by the Federal Highway Administration....
Search Results "Horizontal Projection"
-
Detectable Warnings [§406.8 (DOT’s Standards), §705]
-
REFERENCES
by the Division of the State Architect (DSA) staff, and as a resource for design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects...
-
810.5.3 Platform and Vehicle Floor Coordination
The height and position of a platform must be coordinated with the floor of the vehicles it serves to minimize the vertical and horizontal gaps, in accordance with the ADA Accessibility...
-
Benches
Benches must be strong enough to withstand a vertical or horizontal force of 250 pounds applied at any point on the seat, fastener, mounting device, or supporting structure....
-
810.5.3 Platform and Vehicle Floor Coordination
The height and position of a platform must be coordinated with the floor of the vehicles it serves to minimize the vertical and horizontal gaps, in accordance with the ADA Accessibility...
-
Front grab bar protocol
The horizontal distance between the center of the grab bar and the mid-center, front edge of the platform was 13.5”. ...
-
Sight Lines
Sight Lines Both the horizontal and vertical viewing angles must be considered in the design of assembly areas....
-
Gurney Accessible Bathroom
toilet in the shower for use as a seat or to use with a shower wheelchair for clean up after bowel/bladder program Wall mounted “P” trap for the sink (to clear the knee space) with horizontal...
-
§ 38.175(a)
The design of cars shall be coordinated with the boarding platform design such that the horizontal gap between a car door at rest and the platform shall be no greater than 3 inches and the...
-
Issue 12: What design guidance on natural lighting for low vision persons can be provided in the short term?
Every project is a research and development project....
-
Compliance date
This commenter was concerned that a six-month effective date could lead to projects having to be completely redrawn, rebid, and rescheduled to ensure compliance with the new standards....
-
11B-223 Medical care and long-term care facilities
Future remodel projects would continue to be subject to the 10 percent requirement, until the 10 percent requirement for the entire facility has been met....
-
Roberta Null, Ph.D., ASID. Training for Blind and Low Vision Persons: Color Contrast
It started out as a student project. I think that that’s one of the things that we don’t do enough of, and that is involving students....
-
Overview
The original scope of work for this research project involved a longitudinal study that would examine the influence of five key variables: hydrology, climate, soil condition, grade and cross...
-
Compliance date. (Section-by-Section Analysis)
This commenter was concerned that a six-month effective date could lead to projects having to be completely redrawn, rebid, and rescheduled to ensure compliance with the new standards....
-
General
The 1991 Standards require areas of rescue assistance or horizontal exits in facilities with levels above or below the level of exit discharge....
-
d. Unobstructed Transfer
In the preamble to the MDE NPRM the Access Board noted that it was considering permitting equipment parts to extend a maximum of three inches horizontally beyond the edge of the transfer...
- TownSteel ED6700 Narrow Stile Concealed Vertical Panic Device
- DEL Motorized Solutions Motorized Draperies
- Gamco Maximum Security Clothes Hook - MSA-25
- Mockett HK2B-SSS Triple Coat Hook
- Mockett PTH1-SSS 13-3/16" Paper Towel Holder
-
11B-104.1.1 Construction and manufacturing tolerances
Application of conventional industry tolerances must be on a case-by-case, project-by-project basis....