Moreover, as the text of the rule and preamble make clear, there are no retrofit requirements that would increase costs for covered entities, regardless of size, as requirements apply only...
Search Results "Capital Construction Cost"
Commonly Searched Documents
-
Regulatory Flexibility Act (5 U.S.C. 601-612)
-
11B-810.2.2 Dimensions
Access Board's Note to Reader: The Department of Transportation's ADA Standards indicate that compliance is required to the extent construction specifications are within a public entity's...
-
B. Regulatory Flexibility Act
Both small U.S. and small foreign carriers would incur costs related to training....
-
B. Regulatory Flexibility Act
We requested information on RTT costs in the 2010 and 2011 ANPRMs, but did not receive specific cost data....
-
3.4 Three Year History
3.4 Three Year History: For areas that have been previously altered without providing an accessible path of travel to those areas, the cost of any subsequent alterations to areas served...
-
7.3 Imaging System Accessibility Configuration Examples and Concerns
7.3 Imaging System Accessibility Configuration Examples and Concerns The overall goal of imaging system accessibility configurations is to offer technically feasible, relatively low cost...
-
PUBLIC BUILDING OR FACILITY
[DSA-AC] A building or facility or portion of a building or facility designed, constructed, or altered by, on behalf of, or for the use of a public entity subject to Chapter 1, Section 1.9.1.1...
- Trace Research & Development Center
-
202.4.2 Accessible Features in the Event of Disproportionality
When the cost of alterations necessary to make the path of travel to the altered area fully accessible is disproportionate to the cost of the overall alteration, the path of travel shall...
-
3. UFAS Compliant Units Deployed in Event of Catastrophic Disasters Equivalent to Hurricanes Katrina and Rita
The additional costs under the first scenario (average number of UFAS compliant units deployed per year) are $22,275....
-
Stages.
These costs arise both in the new construction and alteration contexts. ...
-
Background
These problems include increased construction costs, unnecessary demolition and rebuilding, litigation, uncertainty, and - too often - animosity among members of the building team, regulatory...
- Rebuilding Together Austin - Austin, TX
-
§1630.14(d)(3)(iv)
(iv) Thirty percent of the cost of self-only coverage under the second lowest cost Silver Plan for a 40-year-old non-smoker on the state or federal health care Exchange in the location that...
-
Alterations [§202.3]
Alteration of multiple elements in a room or space may provide a cost-effective opportunity to make the entire room or space fully accessible....
- Moen M–Dura Chrome Two-Handle Kitchen Faucet 8226
- Moen M–Dura Chrome Two-Handle Pantry Faucet 8274
- Moen M–DURA Chrome One-Handle Lavatory Faucet 8161
- Moen M–Dura Chrome Two-Handle Kitchen Faucet 8229
-
Play Area
A portion of a site containing play components designed and constructed for children....
-
1.4.4. Operational Requirements
Since the Initial RA, the Department has changed its methodology for estimating the training costs associated with this rulemaking, and the Department’s training costs estimate in the Final...
-
Executive Order 12866 (Regulatory Planning and Review), DOT Regulatory Policies and Procedures, and Executive Order 13563 (Improving Regulation and Regulatory Review)
The costs of this rulemaking are expected to be minimal for two reasons....
- Moen M–Dura Chrome One-Handle Kitchen Faucet 8711
- Moen M–Dura Chrome One-Handle Kitchen Faucet 8701