Scheduled date(s) and time(s) of trip(s): ________________________________________________________ ________________________________________________________________________ 8....
Search Results "Effective Date"
-
Form for Advance Notice Requests and Provision of Equivalent Service
-
§100.305(c)(2)
(2) If the dwelling unit is temporarily vacant, at least one of the occupants immediately prior to the date on which the unit was temporarily vacated was 55 years of age or older....
-
EXISTING BUILDING OR FACILITY
[DSA-AC] A facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this code....
-
EXISTING BUILDING OR FACILITY
[DSA-AC] A facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this code....
-
Existing Facility
A facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this code....
-
End of Document
. – NYA Washington, D.C. 20530 Dated: _April 18, 2019________ FOR THOMAS JEFFERSON UNIVERSITY HOSPITALS, INC....
- Sargent 1331 Series Aluminum Door Closer
- Ultratec Superprint TTY
- Ultratec Superprint 4425 TTY
-
End Note
_________________________ Dated: May 30, 2008. __________________________ Michael B. Mukasey, Attorney General. [FR DOC. E8-12622 Filed 6-16-08; 8:45 am]...
-
Existing facility
Existing facility means a facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this part....
-
§100.142(b)(1)
(1) Information about whether a lender conducted a self-test, the methodology used or scope of the self-test, the time period covered by the self-test or the dates it was conducted;...
-
Existing facility
Existing facility means a facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this part....
-
§ 37.197(a)(1)
(1) On or after the date on which this subpart applies to the entity, it remanufactures an OTRB so as to extend its useful life for five years or more or makes a solicitation for such remanufacturing...
-
SECTION 504 OF THE REHABILITATION ACT OF 1973 POLICY INTERPRETATION NO. 4
A recipient is not required to make structural changes in existing facilities where other methods are effective in achieving compliance with paragraph (a) of this section....
-
§382.143(a)(4)
(4) For other personnel whose employment in any given position commences after May 13, 2009, within 60 days after the date on which they assume their duties....
-
§382.143(b)(4)
(4) For other personnel whose employment in any given position commences after May 13, 2010, or within 60 days after the date on which they assume their duties; and...
-
§382.155(c)
(c) As a carrier, you are not required to respond to a complaint postmarked or transmitted more than 45 days after the date of the incident, except for complaints referred to you by the...
-
FOR THE UNITED STATES
Larsen Assistant United States Attorney 7/21/17 Date...
-
§ 37.139(f)(1)
(1) Notice given of opportunity for public comment, the date(s) of completed public hearing(s), availability of the plan in accessible formats, outreach efforts, and consultation with persons...
-
Appendix C Rotational Penetrometer Data Form
RP Oper-ator: RP Data Recorder: Rotational Penetrometer Man-ufac-turer: Beneficial Designs Serial num-ber: BDRP- Date...
-
Relationship to Accessible Routes: ADA Standard Section 502.7
Section 502.7 covers the current ADA Standards for the relationship between accessible parking spaces and accessible routes.
-
EXISTING BUILDING OR FACILITY
[DSA-AC] A facility in existence on any given date, without regard to whether the facility may also be considered newly constructed or altered under this code....
-
68.10(4) Commencement of Construction
(4) Commencement of Construction--The date of placement of engineering stakes, delivery of lumber or other construction materials to the job site, erection of batter boards, formwork, or...