during construction and at completion....
Search Results "Completion of Construction"
Commonly Searched Documents
-
Background
-
§ 37.141(c)
(c) Entities submitting the above certifications and plan elements in lieu of a completed plan on January 26, 1992, must submit a complete plan by July 26, 1992....
-
ADA and Accessibility Compliance Plan Reviews
Finally, it is important to note that even the most thorough plan review can find only about 50% to 65% of the noncompliant conditions that are typically built into the completed project...
-
Teeing Grounds: ADA Standard Section 238.2.1
Section 238.2.1 covers scoping requirements in the current ADA Standards for teeing grounds.
-
11B-238.2.1 Teeing grounds
Where one teeing ground is provided for a hole, the teeing ground shall be designed and constructed so that a golf car can enter and exit the teeing ground....
-
§ 1194.22(n)
(n) When electronic forms are designed to be completed on-line, the form shall allow people using assistive technology to access the information, field elements, and functionality required...
- Simplified Building Kee Access ADA Railings
- Moen M–DURA Chrome Two-Handle Laboratory Faucet 8116
- Moen M-DURA Rough Chrome Two-Handle Service Sink Faucet 8230
- Moen M-DURA Chrome Two-Handle Service Sink Faucet 8124
- Moen M–DURA Chrome One-Handle Laboratory Faucet 8103
- Moen M–DURA Chrome Two-Handle Laboratory Faucet 8113
- Moen M-DURA Chrome Two-Handle Service Sink Faucet 8232
- Moen M–DURA Chrome One-Handle Laboratory Faucet 8106
-
1.9.1.1.4
the California Building Standards Code relating to access for persons with disabilities and other regulations adopted pursuant to Government Code Section 4450, and in effect at the time construction...
-
Part 3: Polling Place Accessibility Checklist
Elements and spaces in a building constructed or altered before March 15, 2012, that complied with the 1991 Standards may remain in compliance with the 2010 Standards....
-
11B-219.4 Location
assistive-listening system provided is limited to specific areas or seats, then such areas or seats shall be within a 50-foot (15240 mm) viewing distance of the stage or playing area and shall have a complete...
-
68.80. Fees
Fee Schedule: Estimated Construction Cost Plan Review Fee Project Filing Fee Inspection Fee 50,000 - 200,000 $250 $175 $350...
- Speakman Neo Double Robe Hook SA-1008
-
Sargent 11 Line Lever Lock
Requires the Registered User plan or above. Login!
-
Documentation of Impact and Validity Evidence
(c) Completeness. ...
-
§1607.15 Documentation of impact and validity evidence.
(c) Completeness. ...
- KMIR 6 News Story: Jack Nicklaus Fund Raiser for Wounded Veterans, featuring SoloRider golf carts
-
§ 37.139(d)(5)
(5) A timetable for implementing comparable paratransit service, with a specific date indicating when the planned service will be completely operational....