Where provided, central holding cells and court-floor holding cells shall comply with F231.3....
Search Results "Ceramic Tile Flooring"
Commonly Searched Documents
-
F231.3 Holding Cells
-
231.3 Holding Cells
Where provided, central holding cells and court-floor holding cells shall comply with 231.3....
-
11B-233.3.1.2.6.1 Single building with one common (lobby) entrance
access to multifamily dwelling units, in a single building with one common (lobby) entrance, located on a site with difficult terrain conditions or unusual characteristics: All ground floor...
-
11B-231.3 Holding cells
Where provided, central holding cells and court-floor holding cells shall comply with Section 11B-231.3. ...
-
11B-231.3 Holding cells
Where provided, central holding cells and court-floor holding cells shall comply with Section 11B-231.3....
-
11B-231.3 Holding cells
Where provided, central holding cells and court-floor holding cells shall comply with Section 11B-231.3....
-
1. Accessible toilet
Accessible toilet with rear and side grab bars, clear floor space for wheelchair transfer, and an accessible flush valve....
-
231.3 Holding Cells
Where provided, central holding cells and court-floor holding cells shall comply with 231.3....
-
Side Approach
Side Approach The maximum reach depth for a high (54 inch maximum) reach is 10 inches, measured from the clear floor space....
-
5.1.3 Slope
The slope of the surface of the clear floor or ground space inside the camp shelter shall not be steeper than 1:48 (2 percent) in all directions....
-
11B-606.2 Clear floor space
11B-606.2 Clear floor space....
-
5.3.5 Doors
The door shall not swing into or otherwise obstruct the clear floor or ground space required by 5.3.2.1. ...
-
606.2 Clear Floor Space
A clear floor space complying with 305, positioned for a forward approach, and knee and toe clearance complying with 306 shall be provided. EXCEPTIONS: 1....
-
5.1.9 Doors
The door shall not swing into or otherwise obstruct the clear floor or ground space or the turning space required by 5.1.4. ...
-
1007.3.1 Start of Play
A clear floor or ground space 48 inches (1220 mm) minimum by 60 inches (1525 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
1007.3.1 Start of Play
A clear floor or ground space 48 inches (1220 mm) minimum by 60 inches (1525 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
11B-1007.3.1 Start of play
A clear floor or ground space 48 inches (1219 mm) minimum by 60 inches (1524 mm) minimum with slopes not steeper than 1:48 shall be provided at the start of play....
-
Nystrom Building Products MatDesign Roll-Up Mats Premium Carpet Tread Section
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Nystrom Building Products MatDesign Roll-Up Mats Vinyl Abrasive Tread Section
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Nystrom Building Products MatDesign Roll-Up Mats with Premium carpet Tread Model
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Nystrom Building Products MatDesign Roll-Up Mats Vinyl Tread Section
Requires the Premium User plan or above. (Login or upgrade your account!)