When making changes to its plan, the entity shall use the public participation process specified for plan development and shall consider first a reduction in number of trips provided to...
Search Results "Urban Development"
-
§ 37.153(c)(1)
-
II-5.6000 Time periods for achieving program accessibility
A public entity that employs 50 or more persons must develop a transition plan by July 26, 1992, setting forth the steps necessary to complete such changes....
-
6. Processes for Complying with the ADA
b) Develop a transition plan If a town with 50 or more employees decides to make physical changes to achieve program access it must develop a written plan that identifies the modifications...
-
V. IMPROVED POLICIES, PROCEDURES, AND PROGRAMS AFFECTING ACCESS
This training program will be developed and implemented within two years of the effective date of this Agreement. a....
- Allegion Schlage NDE Series Wireless Lock with ENGAGE™ Technology
- Whitehall Mfg. Single Temp Piezo Widespread Pushbutton Electronic Valve Conical Faucet
- Whitehall Mfg. Single Temp Sensor Activated Widespread Electronic Valve Conical Faucet
- Inclusion Solutions CONNECT Emergency Management Plan
-
E. Paperwork Reduction Act
and reviewing the design and implementation plan for the request form, developing, coding, and integrating the form into the Web site, as well as testing, debugging, and connecting the...
-
Species limitations. (Section-by-Section Analysis)
certain animals and to contemplate their suitability in a variety of public contexts, such as restaurants, grocery stores, hospitals, and performing arts venues, as well as suitability for urban...
-
Transfer Devices for Use with Amusement Rides: ADA Standard Section 1002.6
Operators and designers have flexibility in developing designs that will facilitate individuals to transfer onto amusement rides....
-
Shared Use Paths: ADA Standard Section 2.
In its rulemaking on public rights-of-way and on trails and other outdoor developed areas, comments from the public urged the Board to address access to shared use paths since they are distinct...
-
PUBLIC HOUSING
Note: A public entity’s program to provide housing may include but is not limited to: the allocation of local, state, or federal financial assistance, Community Development Block Grants,...
-
11B-1002.6 Transfer devices for use with amusement rides
Operators and designers have flexibility in developing designs that will facilitate individuals to transfer onto amusement rides....
-
11B-1002.6 Transfer devices for use with amusement rides
Operators and designers have flexibility in developing designs that will facilitate individuals to transfer onto amusement rides....
-
Significant alternatives that were rejected
As the Telecommunications Act did not provide a qualifier other than readily achievable, the guidelines developed by the Board apply to all covered products, as opposed to product lines...
-
1003.1 Applicability
provide access to, or egress from, buildings or facilities where accessibility is required for applications listed in Section 1.8.2.1.2 regulated by the Department of Housing and Community Development...
-
C. Preparation – Advance Planning for Emergencies and Disasters
Public officials, specialists from organizations such as the American Red Cross, and community members should work together to develop a comprehensive plan to prepare for emergencies....
-
Tent Pads and Tent Platforms [1013]
For example, small tents may be used at a camping facility near a wilderness access point, while large family tents may be used at a more developed camping facility with numerous constructed...
-
Examples of Involvement
Work with a state agency that is developing a housing program to clarify that some of the units need to be mobility and communication accessible....
-
502.3.9 Event Notification (Section-by-Section Analysis)
This proposed requirement is important to address this issue in these proposed requirements because, on occasion, developers new to accessibility overlook this need....
-
502.2.2 No Disruption of Accessibility Features (Section-by-Section Analysis)
The Advisory Committee strongly recommended that the Board include this requirement in the proposed rule not only to ensure accessibility, but also to avoid platform developers from being...
-
E202.5.1 Basis for a Determination of Undue Burden (Section-by-Section Analysis)
which conformance would impose significant difficulty or expense taking into consideration the agency resources available to the program or component for which the ICT is to be procured, developed...