Within 30 days of the effective date of this Agreement, Camp Bravo shall pay $8,000 to the Complainant, on behalf of her daughter, to compensate her daughter for the harm she has endured...
Search Results "Consent Decree Date"
-
SPECIFIC RELIEF
-
Technical Memorandum TM 2012-03 Shopping Centers or Shopping Malls
TM 2012-03 Shopping Centers or Shopping Malls Effective Date: November 15, 2012 2012 TAS Reference: 206.2.3, Exception 1; 206.2.4, Exception 3 If a private building or facility...
-
Technical Memorandum TM 2012-04 Multi-Story Buildings and Facilities
TM 2012-04 Multi-Story Buildings and Facilities: Effective Date: November 15, 2012 2012 TAS Reference: 206.2.3, Exception 1 – Private Buildings and Facilities The following...
-
Technical Memorandum TM 2012-07 Press Boxes
TM 2012-07 Press Boxes Effective Date: January 22, 2013 2012 TAS Reference: 206.2.7, Exception 1 and 2 The following clarifications are provided to address references to...
-
402.2 Speech-Output Enabled
Speech output shall not be required for: the machine location; date and time of transaction; customer account number; and the machine identifier or label. 6....
-
Technical Memorandum TM 2013-16 Residential Amenity Centers
TM 2013-16 Residential Amenity Centers Effective Date: June 1, 2013 2012 TAS Reference: 68.30(5) Areas, elements, and spaces in residential amenity centers used exclusively...
-
Section 35.151 New Construction and Alterations (Section-by-Section Analysis)
applicable to both public accommodations and facilities used by public entities), so it has applied to any covered facility that was constructed under the 1991 Standards since the effective date...
-
12117(b) Coordination
42 of title 28 and part 1691 of title 29, Code of Federal Regulations, and the Memorandum of Understanding between the Commission and the Office of Federal Contract Compliance Programs dated...
-
End Note
Dated: March 8, 2012. Arne Duncan, Secretary of Education....
-
Equality of Opportunity: The Making of the Americans with Disabilities Act
OPPORTUNITY The Making of the Americans with Disabilities Act Copyright © 1997, 2010 by the National Council on Disability ALL RIGHTS RESERVED REISSUED 2010 Publication date...
-
CHAPTER 35 REFERENCED STANDARDS
The standards are listed herein by the promulgating agency of the standard, the standard identification, the effective date and title, and the section or sections of this document that reference...
-
CHAPTER 35 REFERENCED STANDARDS
The standards are listed herein by the promulgating agency of the standard, the standard identification, the effective date and title, and the section or sections of this document that reference...
-
1. Small Business Threshold Assessment—Methodology and Summary of Results
Option 1 would delay the compliance date for analog screens for four years after publication of the final rule. ...
-
DEFINITIONS
Effective Date of this Settlement Agreement” means the date of the last signature below....
-
In-Flight Audio and Video Services
Until the new rule’s compliance dates, U.S. carriers would remain bound by the provisions of the existing rule....
-
III. Enforcement and Implementation
If the United States is unable to reach a satisfactory resolution of the issue or issues raised within thirty (30) days of the date it provides notice to the XL Center Parties, it may institute...
-
TERMS OF SETTLEMENT
“Effective Date” of this Agreement is the date of the last signature below....
-
Performance for Surface Firmness and Stability
Performance for Surface Firmness and Stability Table 1 identifies the 11 test surface materials, the dates of installation, and the date of the initial and final testing of surfaces at...
- Century Rubbish Chute
- Apex Challenge Circuit CH7000
-
Element-by-element safe harbor for public accommodations. (Section-by-Section Analysis)
The proposed element-by-element safe harbor provided that in existing facilities elements that are, as of the effective date of the 2010 Standards, fully compliant with the applicable technical...
-
APPENDIX A
INFORMATION Upon consent to participate in this study, the playground owner will be asked to designate a site coordinator (study liaison) to work with the research team. ...
- TDI
- Spinal Cord Injury Model System Information Network