Where provided, audible signals or cues shall not be used as the only means of conveying information, indicating an action, or prompting a response...
Search Results "Timed Response"
-
411.1 General
-
412.8.4 Voice Mail and Other Messaging Systems
Where provided, voice mail, auto-attendant, interactive voice response, and caller identification systems shall be usable with a TTY....
-
407.7 Color
Color coding shall not be used as the only means of conveying information, indicating an action, prompting a response, or distinguishing a visual element....
-
§ 37.49(b)
(b) In the case of a station more than fifty percent of which is owned by a public entity, the public entity is the responsible party....
-
407.3.5 Door Delay
Elevator doors shall remain fully open in response to a car call for 3 seconds minimum....
-
Beds in Accessible Guest Rooms and Sleeping Rooms
From this posting you can also link to their responses to other questions in this same ANPRM....
-
https://www.facebook.com/SynGasOBDFuelSaverGermanyDE/
The SynGas OBD Fuel Saver Germany claims to optimize engine performance through the vehicle’s OBD2 system, potentially lowering fuel consumption while improving throttle response and reducing...
-
Guidelines for Requirement 2
Response....
-
Issue 1: APS volume
If there is a lot of traffic noise at some times of the day, the maximum volume of both the pushbutton locator tone and the WALK indication may need to be relatively loud, near 90 dB....
-
VI. ENFORCEMENT
The United States may review compliance with this Agreement at any time, including, but not limited to, testing of any Atlantis services, locations, or facilities. ...
-
§382.85(a)(2)(i)
any seat, not already assigned to another passenger, that accommodates the passenger's needs, even if that seat is not available for assignment to the general passenger population at the time...
-
Sign language interpreter or CART
□ If sign language interpreting and/or computer assisted real time (CART) captioning requests are made, contact an interpreting service early in the process when scheduling these services...
-
410.6.3.1 PSTN (Section-by-Section Analysis)
410.6.3.1 PSTN (Section-by-Section Analysis) This section proposes that, where ICT with real-time two-way voice communication interoperates with the publicly switched telephone network...
-
§382.155(d)(3)
(3) Your response must also inform the complainant of his or her right to pursue DOT enforcement action under this part....
-
§ 1194.21(i)
(i) Color coding shall not be used as the only means of conveying information, indicating an action, prompting a response, or distinguishing a visual element....
-
Sec. 469.054(b)
(b) The owner of a building or facility is responsible for paying a fee charged by the commission for performing a function under this chapter related to the building or facility....
-
§ 1194.25(g)
(g) Color coding shall not be used as the only means of conveying information, indicating an action, prompting a response, or distinguishing a visual element....
-
§27.11(a)(3)
(3) The responsible Departmental official may, where necessary to overcome the effects of a violation of this part, require a recipient to take remedial action:...
-
§27.127(d) Right to counsel.
In all proceedings under this section, the applicant or recipient and the responsible Departmental official have the right to be represented by counsel....
-
§8.56(f) Dismissal of complaint
If the investigation reveals no violation of this part, the responsible civil rights official will dismiss the complaint and notify the complainant and recipient....
-
Toto Site Review: A Criteria-Based Evaluation Framework
Responsible Gaming Safeguards A credible Toto site integrates user protection tools directly into its system—not as hidden options....
-
The Advance Notice of Proposed Rulemaking
The ANPRM dealt with the Department's responsibilities under both title II and title III. Public response to the ANPRM was extraordinary....
-
Section 1193.23 Product design, development and evaluation (Section-by-Section Analysis)
Response....
-
2.1.1. Parameters
The Final RA uses a 15-year time frame for the cost analysis, which is a time frame similar to that used in the Regulatory Impact Analysis of the Final Revised Regulations Implementing...