The disposal unit shall be located below the grab bar, with the opening of the disposal unit 19” minimum (483 mm) above the finish floor....
Search Results "Lavatory Clear Floor Space"
-
11B-604.7.2 Disposal units
-
1.9.1.2 Application
with disabilities as follows: Exception: Certain types of privately funded multistory buildings do not require installation of an elevator to provide access above and below the first floor...
-
§ 38.107(a)(3)
grab bar at least 40 inches long shall be mounted on at least one side wall, with one end not more than 12 inches from the back wall, at a height between 33 inches and 36 inches above the floor...
-
§ 38.123(a)(3)
grab bar at least 40 inches long shall be mounted on at least one side wall, with one end not more than 12 inches from the back wall, at a height between 33 inches and 36 inches above the floor...
-
§ 38.159(c)(3) Ramp threshold
The transition from roadway or sidewalk and the transition from vehicle floor to the ramp may be vertical without edge treatment up to 1/4 inch (6.5 mm)....
-
§ 38.95(c)(3) Ramp threshold
The transition from station platform to the ramp or bridge plate and the transition from car floor to the ramp or bridge plate may be vertical without edge treatment up to 1/4 inch....
-
11B-604.9.5 Flush controls
Hand operated flush controls shall comply with Sections 11B-309.2 and 11B-309.4 and shall be installed 36 inches (914 mm) maximum above the finish floor....
-
11B-608.5.1 Transfer type shower compartments
compartments, the controls, faucets, and shower spray unit shall be installed on the side wall opposite the seat 38 inches (965 mm) minimum and 48 inches (1219 mm) maximum above the shower floor...
-
III-1.7000 Relationship to title II
The first floor is leased as commercial space to a restaurant, a newsstand, and a travel agency....
- Pilot Rock T300/T400 Series Round, Pedestal Table With CONTOUR Bench Seats - Using Expanded Steel
- Seton Reserved Parking Sign (With Graphic) and Post
- Elkay Filtered EZH2O® Bottle Filling Station with Single ADA Cooler
- Landscape Forms Inc. Arcata Collection Benches
- Landscape Forms Inc. Metro 40 Rest Bench
-
711.2 Installation details
The space between the item contained in the sleeve and the sleeve itself and any space between the sleeve and the assembly penetrated shall be protected in accordance with this section....
-
ASSEMBLY AREA
A room or space accommodating fifty or more individuals for religious, recreational, educational, political, social, or amusement purposes, or for the consumption of food and drink, including...
-
F246.4 Outdoor Recreation Access Routes
At least one outdoor recreation access route complying with 1016 shall connect accessible parking spaces or other arrival points serving the viewing area with accessible elements, spaces...
-
Is there a maximum travel distance to entrances from parking and other site arrival points?
Accessible parking spaces must be located on the shortest accessible route to an accessible entrance (relative to other spaces in the parking facility)....
-
Accessible Route to Dumpster and Enclosure
All or any portion of a space used only by employees and used only for work. Corridors, toilet rooms, kitchenettes and break rooms are not employee work areas....
-
Lines of Sight
Section 802.2 covers lines of sight to the screen, performance area, or playing field for persons using wheelchair spaces....
-
CASI Accessibility Construction Inspection Checklist
During construction inspection finish product thicknesses such as flooring materials or wall coverings must be considered when reviewing critical accessibility features, including but not...
-
CALBO Accessibility Construction Inspection Checklist
During construction inspection finish product thicknesses such as flooring materials or wall coverings must be considered when reviewing critical accessibility features, including but not...
-
R310 Passenger Loading Zones (Section-by-Section Analysis)
A vehicular pull-up space 2.4 meters (8 feet) wide minimum and 6.1 meters (20 feet) long minimum must be provided at accessible passenger loading zones....
-
H. After Completing the Survey and Checklist
After Completing the Survey and Checklist Once you have completed the survey and filled out the checklist, you can determine which elements or spaces in a potential shelter facility are...