[See subsections ...]
Search Results "Hybrid Surface System"
Commonly Searched Documents
-
219 Assistive Listening Systems
-
§ 38.103 Public information system
[See subsections ...]
-
T211 Wheelchair Securement Systems
Wheelchair securement systems complying with the technical requirements in T603 must be provided at each wheelchair space....
- Eco-Grip Flooring Video 4 of 8 Routing and Heat Welding
- Eco-Grip Flooring Video 5 of 8 Inside and Outside Corners
- Eco-Grip Flooring Video 3 of 8 Floor Cut In and Fabrication
- Eco-Grip Flooring Video 8 of 8 Floor Accessories and Floor Cleaning
- Ohio Gratings Aluminum Swaged Bar Grating Video
- Eco Grip Flooring 2min HD
- Supa-Trac Installation Video
- Ohio Gratings Informational Video
- Eco-Grip Flooring Video 1 of 8 Welcome and Subfloor Preparation
- Eco-Grip Flooring Video 2 of 8 Eco Grip Flooring Layout
- Eco-Grip Flooring Video 7 of 8 Drain Detail and Base Trim
-
Rotational Penetrometer
When the caster is released, the spring load gauge replicates the force of an individual in a wheelchair over a given surface....
- Aluminum Heavy Duty Wheels n' Heels® InVent Grating
-
T603.5 Securement Systems for Rear-Facing Wheelchair Positions
Rear-facing wheelchair securement systems shall provide forward excursion barriers and padded head rests that comply with ISO 10865-1:2012(E), Wheelchair containment and occupant retention...
-
(3) Adjustability: Transfer Surface Intermediate Heights
In the MDE NPRM there was no requirement for the transfer surface to have intermediate transfer heights....
-
3. Ground and floor surface treatments
Ground and floor surface treatments 4.5 Accessible routes, and spaces, including floors, walks, ramps, stairs, and curb ramps....
-
11B-1008.2.6.1 Accessibility
Ground surfaces shall comply with ASTM F 1951. Ground surfaces shall be inspected and maintained regularly and frequently to ensure continued compliance with ASTM F 1951....
-
11B-1008.2.6.1 Accessibility
Ground surfaces shall comply with ASTM F 1951. Ground surfaces shall be inspected and maintained regularly and frequently to ensure continued compliance with ASTM F 1951....
-
4. Assess During the Planning, Installation and Maintenance Phases
Assess During the Planning, Installation and Maintenance Phases Once the playground surface is installed, an on-site inspection of the surface system should be conducted along the accessible...
-
Public Address Systems
Where public address systems are provided in transportation facilities to convey public information, a means of conveying the same or equivalent information to persons who are deaf or hard...
-
Openings [§302.3]
Openings [§302.3] Openings in ground and floor surfaces, such as grates, are limited in width to prevent passage of a ½” diameter sphere....