49 CFR §§37.42(b), 37.49(e), 37.57 DECEMBER 14, 2011
Search Results "Construction Site"
Commonly Searched Documents
-
ADA & Level Boarding - What happens if a private entity objects?
-
§ 36.401(d)(2)(i)
(i) A shopping center or shopping mall, or a professional office of a health care provider.
-
A4.8.2 Slope and Rise
Ramp slopes between 1:16 and 1:20 are preferred. The ability to manage an incline is related to both its slope and its length. Wheelchair users with disabilities affecting their arms...
-
A4.8.2 SLOPE AND RISE
The ability to manage an incline is related to both its slope and its length. Wheelchair users with disabilities affecting arms or with low stamina have serious difficulty using...
-
1.1.8 Alternate measurement tools
1.1.8 Alternate measurement tools. Walks may be measured with instruments other than a digital inclinometer if they provide the data required for evaluation of tolerances as given in...
-
1.1.13 Flatness of ramp running slope
1.1.13 Flatness of ramp running slope. Measure flatness in the running slope of ramps at 12 - in. (300 mm) increments by using successive, overlapping 24 - in. (600 mm) lengths using...
-
1.1.3 Walk running slope
1.1.3 Walk running slope. Measure for overall running slope (the primary direction of travel) by determining elevations at the ends of the walk, noticeable changes in slope, or at a...
-
§ 35.151(k) Detention and correctional facilities.
(k) Detention and correctional facilities.
-
11B-233.3.1.2.6.5 Additional requirements.
1. Grab bar reinforcement complying with Sections 11B-809.10.5.2, 11B-809.10.6.4, or 11B-809.10.7.3. 2. Interior door opening width complying with Section 11B-404.3.1. 3....
-
12.1 Q...How is the individual building test performed for additional stories, to determine if those stories must also be treated as ground floors?
A. For purposes of determining whether a non-elevator building has more than one ground floor, the point of measurement for additional ground floors, after the first ground floor has...
- Husky 24" Line Generator Digital Laser Level
-
Americans with Disabilities Act (ADA) Standards for Transportation Facilities
Department of Transportation in 2006 for public transportation facilities covered by the ADA in new construction and alterations....
-
Compliance Dates
Compliance Dates On or after March 15, 2012 All newly constructed or altered facilities of public entities and public accommodations, including pools, must comply with the 2010 Standards...
-
3.4.8 Viewing Areas Accessed by Vehicular Ways
The outdoor recreation access route shall connect the distinct viewing locations, accessible outdoor constructed elements, and other accessible elements, accessible spaces, and accessible...
-
14 CFR Parts 382 and 399; 49 CFR Part 27 - Nondiscrimination on the Basis of Disability in Air Travel: Accessibility of Web Sites and Automated Kiosks at U.S. Airports - Preamble
DOT–OST–2011–0177] RIN 2105–AD96 Nondiscrimination on the Basis of Disability in Air Travel: Accessibility of Web Sites and Automated Kiosks at U.S....
-
Planning and Designing Outdoor Recreation Facilities for Horses
"Equestrian Design Guidebook for Trails, Trailheads, and Campgrounds," a comprehensive technical resource, details those elements of planning, design, and construction that are specific...
-
Background
Among the issues we intended to revisit in the SNPRM was a proposal in the initial NPRM to require carriers and their agents to make their Web sites accessible to people with vision impairments...
-
11.2 Q. Under the individual building test, at what point of the planned entrance is the measurement taken?
A. On a horizontal plane, the center of each individual doorway should be the point of measurement when measuring to an arrival point, whether the doorway is an entrance door to the...
-
SETTLEMENT AGREEMENT BETWEEN THE UNITED STATES OF AMERICA AND COCONINO COUNTY REGARDING THE ACCESSIBILITY OF POLLING PLACES
SETTLEMENT AGREEMENT BETWEEN THE UNITED STATES OF AMERICA AND COCONINO COUNTY REGARDING THE ACCESSIBILITY OF POLLING PLACES DJ # 204-49-91 This settlement agreement...
-
1011.6 Water Spouts
Water spouts at water hydrants and water utility hook-ups shall be 28 inches (710 mm) minimum and 36 inches (915 mm) maximum above the ground.
-
1011.6 Water Spouts
Water spouts at water hydrants and water utility hook-ups shall be 28 inches (710 mm) minimum and 36 inches (915 mm) maximum above the ground.
-
1.1.10 Ramps
1.1.10 Ramps. Measure accessible ramps for overall running slope and cross slope as well as local running slope and cross slope variations (flatness) in accordance with Sections...
-
1.1.14 Flatness of ramp cross slope
1.1.14 Flatness of ramp cross slope. For ramps, measure flatness of cross slope by placing a 24 - in. (600 mm) digital inclinometer perpendicular to the line of travel at 4 ft (1200...