Landings shall be provided at the tops of curb ramps and blended transitions. The landing clear length shall be 48 inches (1219 mm) minimum....
Search Results "Transitional Segment"
-
11B-406.5.3 Landings
-
a) ADA
ADA regulations direct public entities to adopt transition and self-evaluation plans....
-
11B-247.1.2.7 Track crossings
Where it is necessary to cross tracks to reach transit boarding platforms, detectable warnings complying with Sections 11B-705.1.1 and 11B-705.1.2.7 shall be provided. ...
-
68.10(10) Curb Line
(10) Curb Line--A line that represents the extension of the face of the curb and marks the transition between the sidewalk and the gutter or roadway at a curb ramp or flush landing....
-
11B-247.1.2.7 Track crossings
Where it is necessary to cross tracks to reach transit boarding platforms, detectable warnings complying with Sections 11B-705.1.1 and 11B-705.1.2.7 shall be provided....
-
11B-247.1.2.7 Track crossings
Where it is necessary to cross tracks to reach transit boarding platforms, detectable warnings complying with Sections 11B-705.1.1 and 11B-705.1.2.7 shall be provided....
- Armor-Tile Tactile Systems Modular Paver Systems
- EZ-ACCESS Suitcase Singlefold AS Ramp
-
R305.2.2 Parallel Curb Ramps
On parallel curb ramps, detectable warning surfaces shall be placed on the turning space at the flush transition between the street and sidewalk....
-
R304.5.4 Counter Slope
The counter slope of the gutter or street at the foot of curb ramp runs, blended transitions, and turning spaces shall be 5 percent maximum....
-
Boarding platform
A platform in a level boarding bus system raised above standard curb height in order to align vertically with the transit vehicle entry for level boarding and alighting....
-
§ 37.45 Construction and alteration of transportation facilities by private entities
In constructing and altering transit facilities, private entities shall comply with the regulations of the Department of Justice implementing Title III of the ADA (28 CFR part 36)....
- Ronick Matting Systems BaseMat 300 Entrance Floor Mat
-
DEADLINES FOR STRUCTURAL CHANGES {35.150}
CHANGES {35.150} Where structural changes are required: As expeditiously as possible Completed no later than January 26, 1995 Following the “Transition...
-
E. EXPERT TESTIMONY
Mastin is a licensed architect and was received by the Court as an expert in architecture, construction, disability access, program access for mobility disabled persons, ADA transition plans...
-
Bus Loading Zones: ADA Standard Section 209.2.2
Section 209.2.2 covers scoping requirements in the current ADA Standards for bus loading zones.
-
1003.1 Applicability
Exception: [SFM] Exiting requirements for Fixed Guideway Transit Systems shall be as per Section 443....
-
Trailhead Signs
trailheads on newly constructed or altered trails designed for use by hikers or pedestrians, the final rule requires the signs to include information on the length of the trail or trail segment...
-
11B-705.1.2.2.2.1 One entrance/exit point
Where the turning space has one entrance/exit point other than the sloped ramp segments, detectable warnings shall be 36 inches (914 mm) deep, as measured perpendicular to the curb, and...
-
1003.3.1 Boat Slip Clearance
Clear pier space shall be permitted to be 36 inches (915 mm) wide minimum for a length of 24 inches (610 mm) maximum, provided that multiple 36 inch (915 mm) wide segments are separated...
-
Comments
Most transit industry commenters opposed doing so, citing a variety of reasons....
- Armor-Tile Tactile Systems Cast In Place Detectable Warning Surface System
-
Rail Station Signs: ADA Standard Section 810.6
Emerging technologies such as an audible sign systems using infrared transmitters and receivers may provide greater accessibility in the transit environment than traditional Braille and...
-
11B-209.2.2 Bus loading zones
For example, designated public transportation vehicles include buses and vans operated by public transit agencies, while specified public transportation vehicles include tour and charter...