Search Results "New Construction"
Commonly Searched Documents
- Kompan, Inc. FRE3000 - Stargazer
-
Re: Husky 24" Line Generator Digital Laser Level
See Bill Hecker, AIA, Kirola vs City and County of San Francisco, Expert for DOJ, testimony with regards to Laser level lengths.
-
What is the Minimum Width for Non-Level Boarding?
[49 CFR §§ 37.9, 37.41-37.43, 38.125] June 16, 2015
-
§27.3 Applicability.
[44 FR 31468, May 31, 1979, as amended at 56 FR 45621, Sept. 6, 1991; 68 FR 51390, Aug. 26, 2003; 80 FR 46513, Aug. 5, 2015]
-
1.1.17 Stairs
1.1.17 Stairs. Measure cast - in - place stairs for both riser height and tread depth of each riser and tread. For stairs 60 in. (1520 mm) or less in width, measure along a line...
-
1.1.9 Horizontal gaps and vertical alignment
1.1.9 Horizontal gaps and vertical alignment. Measure for local horizontal discontinuities and variations in vertical alignment such as at concrete joints, gaps, grade breaks, and at...
-
Trash, Recycling, and Other Essential Containers
If containers are provided on trails, ensure that routes connecting those containers and the other major constructed features comply with technical requirements for trails rather than outdoor...
-
Noncomplying new construction and alterations. (Section-by-Section Analysis)
Noncomplying new construction and alterations....
-
1.1.8 Alternate measurement tools
1.1.8 Alternate measurement tools. Walks may be measured with instruments other than a digital inclinometer if they provide the data required for evaluation of tolerances as given in...
-
1.1.13 Flatness of ramp running slope
1.1.13 Flatness of ramp running slope. Measure flatness in the running slope of ramps at 12 - in. (300 mm) increments by using successive, overlapping 24 - in. (600 mm) lengths using...
-
1.1.3 Walk running slope
1.1.3 Walk running slope. Measure for overall running slope (the primary direction of travel) by determining elevations at the ends of the walk, noticeable changes in slope, or at a...
-
Master Strategy and the Retooling of the ADA
Proponents could therefore argue that the bill was an application of tested principles, not a new creation....
-
Telescopes and Periscopes
Telescopes or periscopes for use from a seated position must be connected to the other major constructed features at the recreation area by an outdoor recreation access route and meet the...
-
Attachment H
Attachment H: Modifications to Newly Constructed Facilities Within 1 year, the City of Waukegan will make the following modifications to Waukegan Fire Station #2: There...
- Husky 24" Line Generator Digital Laser Level
-
Attachment G: Modifications to Newly Constructed Facilities
Attachment G: Modifications to Newly Constructed Facilities...
-
18) Elevators and platform lifts in new construction and alterations
18) Elevators and platform lifts in new construction and alterations ADAAG: The elevator exemption for two-story places of public accommodation or commercial facilities does not apply...
-
3.4.8 Viewing Areas Accessed by Vehicular Ways
The outdoor recreation access route shall connect the distinct viewing locations, accessible outdoor constructed elements, and other accessible elements, accessible spaces, and accessible...
-
Planning and Designing Outdoor Recreation Facilities for Horses
"Equestrian Design Guidebook for Trails, Trailheads, and Campgrounds," a comprehensive technical resource, details those elements of planning, design, and construction that are specific...
-
7.4.10.2 Outdoor Recreation Access Routes (ORARs)
section 2.0 shall connect the following places at trailheads: Accessible parking spaces or other arrival point; Starting point of the trail; and Accessible outdoor constructed...
-
1011.6 Water Spouts
Water spouts at water hydrants and water utility hook-ups shall be 28 inches (710 mm) minimum and 36 inches (915 mm) maximum above the ground.
-
1011.6 Water Spouts
Water spouts at water hydrants and water utility hook-ups shall be 28 inches (710 mm) minimum and 36 inches (915 mm) maximum above the ground.
-
1.1.10 Ramps
1.1.10 Ramps. Measure accessible ramps for overall running slope and cross slope as well as local running slope and cross slope variations (flatness) in accordance with Sections...
-
1.1.14 Flatness of ramp cross slope
1.1.14 Flatness of ramp cross slope. For ramps, measure flatness of cross slope by placing a 24 - in. (600 mm) digital inclinometer perpendicular to the line of travel at 4 ft (1200...