Search Results "New Construction"
Commonly Searched Documents
- Landscape Forms Inc. Presidio Trash Receptacle
 - 
    
  
  Landscape Forms Inc. Wellspring Trash Receptacle
  Requires the Premium User plan or above. (Login or upgrade your account!)
 - 
    
  
  Landscape Forms Inc. Austin Trash Receptacle
  Requires the Premium User plan or above. (Login or upgrade your account!)
 - 
    
  
  Landscape Forms Inc. FGP Trash Receptacle
  Requires the Premium User plan or above. (Login or upgrade your account!)
 - 
    
  
  United States of America v. Quiktrip Corporation - Consent Decree
  
IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEBRASKA Omaha Division THE UNITED STATES OF AMERICA, Plaintiff, v. QUIKTRIP...
 - 
    
  
  11B-809.8 Doors
  
Exterior landings of impervious construction (e.g., concrete, brick, flagstone) serving primary entry doors and required exit doors are limited to not more than 1/2 inch (12.7 mm) of change...
 - 
    
  
  1011.2.2 Surface
  
The surface of the clear ground space shall be firm and stable.
 - 
    
  
  1011.2.2 Surface
  
The surface of the clear ground space shall be firm and stable.
 - 
    
  
  Exception 8
  
When the adjusted construction cost is less than or equal to the current valuation threshold, as defined in Chapter 2, Section 202, the cost of compliance with Section 11B-202.4 shall be...
 - 
    
  
  § 37.42(d)
  
(d) Before constructing or altering a platform at a station covered by paragraph (c) of this section, at which a railroad proposes to use a means other than level-entry boarding, the railroad...
 - 
    
  
  § 37.42(d)
  
(d) Before constructing or altering a platform at a station covered by paragraph (c) of this section, at which a railroad proposes to use a means other than level-entry boarding, the railroad...
 - 
    
  
  11B-233.3.1.2.6.5 Additional requirements.
  
1. Grab bar reinforcement complying with Sections 11B-809.10.5.2, 11B-809.10.6.4, or 11B-809.10.7.3. 2. Interior door opening width complying with Section 11B-404.3.1. 3....
 - Bosch Power Tools - GPL-3 3 Point Laser
 - Landscape Forms Inc. Chase Park Bench Collection
 - Grants for Home Modification: 16 Resources for Homeowners with Disabilities
 - 
    
  
  SETTLEMENT AGREEMENT BETWEEN THE UNITED STATES OF AMERICAN AND THE CITY OF WAUKEGAN, ILLINOIS UNDER THE AMERICANS WITH DISABILITIES ACT
  
[See subsections ...]
 - Willoughby Industries Stainless Steel WODS ADA Outdoor Shower
 - 
    
  
  11B-202 Existing buildings and facilities
  
limited to 20 percent of the adjusted construction cost of alterations, structural repairs or additions....
 - 
    
  
  IV. Deeming 2010 Standards as an Alternative Accessibility Standard for Section 504 Compliance
  
Rather, it means that when a HUD recipient undertakes new construction or alterations and chooses to use the 2010 Standards with the exceptions outlined in this document, the recipient must...
 - 
    
  
  § 36.508 Effective date.
  
[See subsections ...]
 - 
    
  
  Sec.36.508 Effective date
  
Sec.36.508 Effective date.
 - Landscape Forms Inc. 35 Stay Bench
 - Landscape Forms Inc. Washington Square Bench Collection
 - CCDA (California Commission on Disability Access) Accessibility Construction Inspection Checklist