(5) In determining the site or location of a facility, an applicant for assistance or a recipient may not make selections
Search Results "FEMA: Federal Emergency Management Agency"
-
§104.4(b)(5)
-
§104.5 Assurances required.
[45 FR 30936, May 9, 1980, as amended at 65 FR 68054, Nov. 13, 2000]
-
§104.5(b) Duration of obligation
(b) Duration of obligation.
-
Requirements to Remember for: Remanufacture or Rebuilt Vehicles
[See subsections ...]
-
Alteration of a recreation site, building, or facility
Alteration of a recreation site, building, or facility—A change to a portion of a recreation site, building, or facility that is addressed by the accessibility guidelines and that...
-
Section 37.153 FTA Waiver Determination
Section 37.153 FTA Waiver Determination If the FTA Administrator grants a waiver for undue financial burden, the waiver will be for a specified period of time and the...
-
C. Getting Started
An evaluation of shelter accessibility should focus on those areas of the facility that may be used for providing shelter in an emergency....
-
Inclusive Safety information
See “Emergency Travel Safety Tips for Overnight Stays.”...
-
Amendments to 49 CFR Part 27
Amendments to 49 CFR Part 27 Section 27.67(d) has been revised to reference the Access Board facility guidelines (found in appendix A to part 37) as well as the Uniform Federal Accessibility...
-
3. Automatic Call Distribution (ACD)
Another feature employed by PSAPs is automatic call distribution (ACD). ACD places incoming calls into a queue, sends out a programmed message to callers to let them know that their...
-
4. Switching Between Voice Mode and TTY Mode
All call takers must have the capability to switch back and forth easily from TTY mode to voice mode during the same call. This is especially necessary for silent calls because it...
-
5. Voice Carryover and Hearing Carryover
Voice carryover (VCO) is a communication hybrid of TTY and voice. With VCO, a person with hearing loss can speak directly to the call taker and read the response that is typed...
-
Chapter 5 BUILDING AN EVACUATION PLAN FOR A PERSON WITH A SPEECH DISABILITY
[See subsections ...]
-
Chapter 2 BUILDING AN EVACUATION PLAN FOR A PERSON WITH LIMITED MOBILITY
[See subsections ...]
-
Chapter 3 BUILDING AN EVACUATION PLAN FOR A PERSON WHO IS BLIND OR HAS LOW VISION
[See subsections ...]
-
Chapter 4 BUILDING AN EVACUATION PLAN FOR A PERSON WHO IS DEAF OR HARD OF HEARING
[See subsections ...]
-
Chapter 6 BUILDING AN EVACUATION PLAN FOR A PERSON WITH A COGNITIVE DISABILITY
All standard building egress systems require the ability to process and understand information in order to safely evacuate. A cognitive disability prevents a person from using or...
-
d-iii
d-iii. Is the ramp width, measured between handrails, at least 36 inches? [ADA Standards § 4.8.3] Yes No
-
E1-c
E1-c. Does the accessible route from the accessible entrance to all activity areas change levels using a ramp, lift or elevator? [ADA Standards §§ 4.1.3(1), 4.3.8] Yes ...
-
d-i
d-i. Is the slope no greater than 1:12? [ADA Standards § 4.8.2] Yes No Note: For existing ramps, the slope may be 1:10 for a 6-inch rise and 1:8 for a 3-inch rise in...
-
F2
F2. If there is a built-in reception or other type of counter, does it have a section that is at least three feet long that is no higher than 36 inches above the floor or is there a...
-
C1-e
C1-e. Where an accessible route crosses a curb, is a curb ramp provided? [ADA Standards § 4.3.8] Yes No
-
G. Sleeping Areas
G. Sleeping Areas Each accessible sleeping area needs to be on an accessible route connecting it to other activity areas in the shelter, including toilet rooms and bathing areas....
-
g-v
g-v. If the answers to questions g-ii thru g-iv are No, can the door be propped open? Yes No If an activity area is not on an accessible route and cannot be made...