Construction is building a new trail or segment of trail where there was no trail before....
Search Results "Construction Cost"
Commonly Searched Documents
-
Construction (Trail Terminology)
-
Deferred Maintenance
Include the costs for any uncompleted work that is needed to bring a building into compliance with the provisions of ABA that were in force at the time of construction or major improvement...
-
68.51. Review of Construction Documents
Review of Construction Documents....
-
Construction Sites (§203.2)
Construction Sites (§203.2) Structures directly associated with the actual processes of construction and portable toilets used only by construction workers Examples: scaffolding...
-
203.2 Construction Sites
203.2 Construction Sites....
-
§104.23(a) Design and construction
(a) Design and construction. ...
-
New Construction
New Construction – facilities constructed for first occupancy after January 26, 1993 where the construction documents were submitted for permitting after January 26, 1992....
-
F203.3 Construction Sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
203.2 Construction Sites
Structures and sites directly associated with the actual processes of construction, including but not limited to, scaffolding, bridging, materials hoists, materials storage, and construction...
-
4.1.1. Total Costs
Total costs in the primary analysis are calculated by venue type and include the cost categories listed below: Captioning Hardware Acquisition Costs; Audio Description...
-
Costs
Access Routes $4,497 to $6,530 to purchase roll-out mats for beach access routes, if parking areas, toilet facilities, bathing facilities, and circulation paths serving beaches are constructed...
-
F. Cost and benefits of movie captioning and video description regulations
Are there any cost-sharing or cost-allocation agreements that help mitigate these costs for movie theater owners or operators? Is most or all of this expense a one-time fee?...
-
68.101(c)(1) New construction
(1) New construction shall comply with TAS 201.1....
-
3.4.5. Unit Costs by Venue
The Final RA estimates the average unit costs of the hardware and the devices based on the retail prices of all currently-available equipment from the three manufacturers....
-
Outdoor Constructed Features Along Trails [F247.5]
When outdoor constructed features, such as benches (figure 11), picnic tables, or trash and recycling receptacles, are provided along a trail, at least 20 percent, but no less than one,...
-
F247.5 Outdoor Constructed Features
Where outdoor constructed features are provided on trails, other than within facilities specified in F247.4, at least 20 percent, but not less than one, of each type of outdoor constructed...
-
Sec. 12201. Construction. [Section 501]
[See subsections ...]
-
Outdoor Constructed Features
[See subsections ...]
-
§ 35.151(a) Design and construction
(a) Design and construction....
-
§ 35.151(a) Design and construction.
(a) Design and construction....
-
68.10(7) Construction Documents
(7) Construction Documents--Drawings, specifications, addenda, change orders, construction change directives and other supplemental documents prepared for the purpose of regulatory approval...
-
68.10(4) Commencement of Construction
(4) Commencement of Construction--The date of placement of engineering stakes, delivery of lumber or other construction materials to the job site, erection of batter boards, formwork, or...
-
8. New Construction and Alterations
New Construction and Alterations Otherwise, as previously agreed, new construction and alterations within the meaning of 28 C.F.R. § 35.151 will not count toward the $31 million, including...
-
68.10(6) Completion of Construction
(6) Completion of Construction--The date when a construction project results in occupancy or the issuance of a certificate of occupancy....