(C) Approval. --For purposes of subparagraph (B), the Architect of the Capitol shall submit proposed remedies and procedures to the Speaker of the House of Representatives....
Search Results "Approved"
-
12209(b)(3)(C)
-
702.3.1 ANSI/AIIM/ISO 14289-1-2016
Document Management Applications - Electronic Document File Format Enhancement for Accessibility - Part 1: Use of ISO 32000-1 (PDF/UA-1), ANSI-approved February 8, 2016, IBR approved for...
-
16(b)
HWI will have the right to review and approve the Survey Instrument within 15 days of receipt....
-
907.2.6.2.3 Smoke detectors
An approved automatic smoke detection system shall be installed throughout resident housing areas, including sleeping areas and contiguous day rooms, group activity spaces and other common...
-
1015.2 Where required
Portions of an occupiable roof located less than 30 inches (762 mm) measured vertically to adjacent unoccupiable roof areas where approved guards are present at the perimeter of the roof...
-
104.11 Alternative materials, design and methods of construction and equipment
intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved...
-
907.2 Where required
An approved manual, automatic, or manual and automatic fire alarm system shall be provided in accordance with Sections 907.2.1 through Section 907.2.23....
-
L.
Cinemark's stadium-style movie theater designs in Texas were approved by the Texas Department of Licensing and Regulation as accessible under the Texas Accessibility Standards, state accessibility...
-
907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more
Exception: Where approved, the prerecorded announcement is allowed to be manually deactivated for a period of time, not to exceed 3 minutes, for the sole purpose of allowing a live voice...
-
QUESTION: WHEN DO THE REQUIREMENTS OF SECTION 37.42 BEGIN TO APPLY?
“Approval for entry into final design” is a concept used in FTA-assisted “New Starts” projects....
-
ADA Compliant Plumbing Products for Accessible Kitchens and Baths - CEU Course
AIC Info: Course # AEC562 CPD Hours: 1.00 AIC approved course. Hours must be self-reported to the AIC. BOMI Info: Course # AEC562 CPD Hours: 1.00 BOMI approved course....
-
11B-703.1.1.2 Inspection
Signs and identification devices shall be field inspected after installation and approved by the enforcing agency prior to the issuance of a final certificate of occupancy per Chapter 1,...
-
11B-703.1.1.2 Inspection
Signs and identification devices shall be field inspected after installation and approved by the enforcing agency prior to the issuance of a final certificate of occupancy per Chapter 1,...
-
11B-703.1.1.2 Inspection
Signs and identification devices shall be field inspected after installation and approved by the enforcing agency prior to the issuance of a final certificate of occupancy per Chapter 1,...
-
§8.57(c)(3)
(3) The action has been approved by the Secretary; and...
-
1007.8.1 System requirements
Two-way communication systems shall provide communication between each required location and a central control point location approved by the fire department....
-
1.2.2 Alternative materials, design and methods of construction and equipment
intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved...
-
Effective Date
“Effective Date” is the date the Consent Decree is approved by the Court....
-
Note
Approved July 26, 1990; Amended November 21, 1991....
-
907.1.2 Equipment
Systems and their components shall be listed and approved for the purpose for which they are installed....
-
K.
, and attempting to enforce its interpretation of Standard 4.33.3, that the DOJ's interpretation illegally deprived Cinemark of due process, that Cinemark relied in good faith on state approvals...
-
1.2.3 Alternative materials, design and methods of construction and equipment
intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved...
-
1.2.3 Alternative materials, design and methods of construction and equipment
intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved...
-
5. Conditions Precedent
Settlement Agreement shall be conditioned upon, and shall be effective only upon, the occurrence of each and every one of the following events: (a) The Settlement Agreement has been approved...