For this reason, built-up curb ramps cannot project into access aisles....
Search Results "Project"
-
Parking Spaces [4.6.3]
-
2.4.4.1. Repair Costs
Captioning and audio description hardware is typically mounted high on a wall in a movie theater auditorium or otherwise placed in the projection booth. ...
-
4.21.2 Size and Clearances
To this end, several projects incorporated a half height wall to enable a caregiver using a hand held shower to stay dry while standing behind a resident seated in a shower chair....
-
Detectable Warnings [§406.8 (DOT’s Standards), §705]
DOT also requires detectable warnings on curb ramps in projects funded by the Federal Highway Administration....
-
REFERENCES
by the Division of the State Architect (DSA) staff, and as a resource for design professionals, to promote more uniform statewide criteria for plan review and construction inspection of projects...
- Bobrick Utility Hook B-670
- Bobrick Utility Hook B-6707
- American Specialties Clothes Hook 8425
- Bobrick Hat and Coat Hook B-682
-
Issue 12: What design guidance on natural lighting for low vision persons can be provided in the short term?
Every project is a research and development project....
-
Compliance date
This commenter was concerned that a six-month effective date could lead to projects having to be completely redrawn, rebid, and rescheduled to ensure compliance with the new standards....
-
11B-223 Medical care and long-term care facilities
Future remodel projects would continue to be subject to the 10 percent requirement, until the 10 percent requirement for the entire facility has been met....
-
Roberta Null, Ph.D., ASID. Training for Blind and Low Vision Persons: Color Contrast
It started out as a student project. I think that that’s one of the things that we don’t do enough of, and that is involving students....
-
Overview
The original scope of work for this research project involved a longitudinal study that would examine the influence of five key variables: hydrology, climate, soil condition, grade and cross...
-
Compliance date. (Section-by-Section Analysis)
This commenter was concerned that a six-month effective date could lead to projects having to be completely redrawn, rebid, and rescheduled to ensure compliance with the new standards....
- Symmons SCOT® Slow-Closing Omni Temperature Lavatory Faucet S-60-H
- Bobrick Clothes Hook B-233
- Bobrick 24" Hook Strip B-232 x 24
- DEL Motorized Solutions Motorized Draperies
- TownSteel ED6700 Narrow Stile Concealed Vertical Panic Device
-
11B-104.1.1 Construction and manufacturing tolerances
Application of conventional industry tolerances must be on a case-by-case, project-by-project basis....
-
11B-104.1.1 Construction and manufacturing tolerances
Application of conventional industry tolerances must be on a case-by-case, project-by-project basis....
- Mockett HK2B-SSS Triple Coat Hook
- Gamco Maximum Security Clothes Hook - MSA-25