The information in this brochure is based on the experience of driver rehabilitation specialists and other professionals who work with individuals who require adaptive devices for their...
Search Results "CASp: Certified Access Specialist"
Commonly Searched Documents
-
National Highway Traffic Safety Administration
- American Academy of Physical Medicine and Rehabilitation (AAPM&R)
- Just Manufacturing Commercial Deck Mounted Single Control Lavatory Faucet
- HEWI Panic Bar EN 1125
-
QUESTION: WHEN A RAIL OPERATOR CONSTRUCTS A NEW STATION PLATFORM OR ALTERS AN EXISTING STATION PLATFORM, DOES 49 CFR PART 37 REQUIRE THE RAIL OPERATOR ENSURE THAT THE PLATFORM IS AT LEAST 8 INCHES ABOVE TOP OF RAIL, EVEN IF THE RAILROAD OPERATOR WILL PROVIDE ACCESSIBILITY CONSISTENT WITH THE REQUIREMENTS OF SECTION 37.42?
ANSWER: Public entities, such as Amtrak and commuter operators, must construct a new facility for use in designated public transportation so that it is readily accessible to and...
- Haws AXION® MSR Barrier Free Recessed Shower and Eye/Face Wash 8356WCC
- Diversified Woodcrafts ADA Compatible Mobile Lab Station with Flat Top 4352KF-RS
- Corbin Russwin Inc. ED5000 Series Exit Device
- USDA Forest Service Accessibility Guidebook for Outfitters & Guides Operating on Public Lands
-
SETTLEMENT AGREEMENT BETWEEN THE UNITED STATES OF AMERICA AND PALACE SPORTS AND ENTERTAINMENT, LLC, REGARDING THE PALACE OF AUBURN HILLS
[See subsections ...]
- Just Manufacturing Backsplash Mounted Sink Faucet with Gooseneck Spout
- Cal-Royal 900 Series Hydraulic Door Closers
- Landscape Forms Inc. Metro 40 Rest Bench
- Just Manufacturing Brass Service Sink Faucet with Hose Thread
- DORMA C300 Series Locks Door Hardware
-
Section 37.173 Training
Section 37.173 Training A well-trained workforce is essential in ensuring that the accessibility-related equipment and accommodations required by the ADA actually result in the delivery...
-
Choice of Option One for Defining ‘‘Designed and Constructed for First Occupancy’’ (Preamble, Section-by-Section Analysis)
standards, a building would be considered to be ‘‘for first occupancy’’ after January 26, 1993, only (1) if the last application for a building permit or permit extension for the facility is certified...
-
Choice of Option One for Defining "Designed and Constructed for First Occupancy'' (Section-By-Section Analysis and Response to Comments)
standards, a building would be considered to be "for first occupancy'' after January 26, 1993, only (1) if the last application for a building permit or permit extension for the facility is certified...
- Figure 404.2.4.1(k) Maneuvering Clearances at Manual Swinging Doors and Gates: Latch Approach, Push Side with Closer – Drawing from the U.S. Access Board
- Figure 404.2.4.1(i) Maneuvering Clearances at Manual Swinging Doors and Gates: Latch Approach, Pull Side with Closer – Drawing from the U.S. Access Board
- TownSteel ED1400F Grade 1 Mortise Fire Device
- TownSteel TDC 85 ALUMINUM Grade 1 Door Closer
- Caroma® USA Caravelle Smart 270 One Piece Toilet
-
4. Perspectives of Equipment Types
The devices that produce X-rays must also be certified to FDA to meet the applicable performance standards for radiation safety found in 21CFRSubchapter J....