gripping surfaces of standing supports on diagnostic equipment used by patients in a standing position: a) Can the gripping surfaces of standing supports on different types of equipment meet...
Search Results "Pre-Construction Meeting"
Commonly Searched Documents
-
Standing Supports (M304.3 and M305.3)
-
Section 1194.31 Functional Performance Criteria (Preamble, Section-by-Section Analysis)
For example, an interactive telephone menu that requires the user to say or press "one" would meet this provision. (See §1194.27(e) in the NPRM.)...
-
11B-404.2.9 Door and gate opening force
ETA Editor's Note The CBC limitation for opening force at non-rated exterior doors is more stringent than 2010 ADAS, and can be difficult to meet without a powered device at exterior...
-
II-7.1000 Equally effective communication
Closed captioning of such programs is sufficient to meet this requirement. Must tax bills from public entities be available in Braille and/or large print?...
-
11B-404.2.9 Door and gate opening force
ETA Editor's Note The CBC limitation for opening force at non-rated exterior doors is more stringent than the 2010 ADA Standards, and can be difficult to meet without a powered device...
- Ampetronic MLD9 MultiLoop Driver Hearing System
-
809 Residential Dwelling Units
Both the ADA and ABA establish design requirements for new construction and alterations that ensure full access for persons with disabilities....
-
E. IMPLEMENTATION AND ENFORCEMENT
This Agreement is limited to the Museum described in Paragraph 4 above, and does not apply to any other design or construction project of or related to the Museum....
-
The Department’s Rulemaking History
Still other commenters addressed the effective date of the proposed standards, the triggering event by which the effective date is calculated for new construction, and variations on a safe...
-
VI. IMPLEMENTATION AND ENFORCEMENT OF AGREEMENT
This Settlement Agreement shall remain in effect until the latter of (i) the completion and approval by the United States of Olympia’s relocation, new construction, or renovation as set...
-
FAQ: How do I enter a New CAD/BIM File in my Corada WorkSpace?
. - 308.3 in the 2010 ADA Standards for Accessible Design Pocket Guide and 308.3 in the 2012 Florida Accessibility Code for Building Construction Pocket Guide)....
-
III. ARCHITECTURAL ACCESS
Kaiser will ensure that all new construction and alterations affecting usability of Kaiser facilities comply with federal and state disability access codes, including ADAAG and Title 24....
-
Sections 35.108(e) and 36.105(e)—Has a Record of Such an Impairment
This is because the rules of construction in the ADA Amendments Act and the Department’s regulations provide that an individual with an impairment that is episodic or in remission can be...
-
The Department's Rulemaking History
Still other commenters addressed the effective date of the proposed standards, the triggering event by which the effective date is calculated for new construction, and variations on a safe...
- Disabled Resource Services - Fort Collins, Loveland, CO
- Stavros Center for Independent Living, Inc. - Amherst, Greenfield, Springfield, MA
- Panda S.81 All Aluminum Multi-Slide Door System
- Detecto 6550 Portable Wheelchair Scale
- Detecto BRW1000 Portable Wheelchair Scale
- Mannington Mills Allegiant Collection Commercial Carpet
- AccessRec De-Bug All Terrain Wheelchair
- Guardian Barrier-Free Safety Station with WideArea™ Eye/Face Wash GBF1909PCC
- Excel Dryer, Inc. CAST Cover Series HANDS OFF® Automatic Sensor Activated Hand Dryers
-
V. REMEDIAL ACTIONS
Classification review interviews; Grievance interviews or processes; Religious services; Non-criminal investigations conducted by the SCDC; and Pre-release...