Persons attending the meetings are requested to refrain from using perfume, cologne, and other fragrances for the comfort of other participants (see http://www.access-board.gov/the-board...
Search Results "Pre-Construction Meeting"
Commonly Searched Documents
-
36 CFR Part 1194 - Proposed Information and Communication Technology (ICT) Standards and Guidelines NPRM
-
7. References
Proceedings from Road Profile Users Group Meeting September 22-24, 1992. Lincoln, NE International Organization for Standardization. (1997)....
-
7. What remedies address violations of the ADA’s integration mandate in the context of disability employment systems?
information about supported employment services in integrated settings and about opportunities that will allow them to make informed decisions about working in integrated employment (including meeting...
-
Section 37.105 Equivalent Service Standard
Does the present service meet the equivalency standard? (In answering this question, the point of reference is the next potential customer who needs an accessible vehicle....
-
Stages.
These costs arise both in the new construction and alteration contexts. ...
-
4. Implications for Standards
The engineered surfaces were laid on flat floors and constructed so that there would be very little vibrations caused by long wavelength deviations....
-
Site Profiles by Surface Type
New playground sites were brought into the study each year as they were constructed and identified by the playground owners. ...
-
FAQ: How do I enter a New Document in my Corada WorkSpace?
Examples include: CHAPTER 1: APPLICATION AND ADMINISTRATION; 202.1 General; Subpart D -- New Construction and Alterations 'Section Number' - Applicable if the document you are inputting...
-
Appendix 2: Survey Forms: Curb Ramps
Curb Ramps Construction/Alteration Date (circle one): Before 1/26/92 After 1/26/92 Facility Name/Address: Date: Location: Surveyors...
-
e. Projected Reporting, Record-Keeping Requirements and Other Compliance Requirements of the Rule
This 3 percent is a factor commonly used in construction and equipment maintenance. ...
-
Tiles
The playground owner attributed the construction error to the learning curve involved with installation of the new surface and reported each new site was improved based on the experience...
-
Poured in Place Rubber
The error in installation is attributed to the contractor and pressure to stay on schedule as the construction season came to a close for the winter. ...
-
I. BACKGROUND AND JURISDICTION
The Palace is an existing facility originally constructed prior to the effective date of the ADA, and so is subject to the "readily achievable" barrier removal provisions of the ADA at 42...
-
B. The 2010 Standards Regarding Public Entrances Are Intended To Achieve the Same Result As the 1991 Standards Regarding Public Entrances
To that end, the ADA requires that new construction, such as Defendants’ stores, be “readily accessible to and usable by individuals with disabilities,” except where an entity can demonstrate...
- NABCO GT300 & GT8300 Overhead Concealed Low-Energy Swing Door Operator
- American Standard Cadet 2-Handle High-Arc Bar Sink Faucet 2475F
- Tormax Technologies iMotion® TN 110 In-Floor Swing Door Operator (High and Low Energy)
- Corbin Russwin Inc. IN120 Intelligent WiFi Access Control
- DORMA ED400 Swing Door Operator
- Door King Inc. 9100 Slide Gate Operator Residential & Commercial
- Norton Surface Mounted 5700 Series Low Energy Door Operator
- Norton Surface Mounted 5900 Series Low Energy Door Operator
- Pilot Rock FSW-26/18 Campfire Ring
- Allegion Schlage CS200-Series Mechanical Locks with Tubular Interconnect