rooms with in-swinging doors, stairs, elevators, location of accessible routes to stages, accessible attorney areas and witness stands, assistive listening systems, and accessible teeing grounds...
Search Results "Ground Floor Exit"
-
Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis)
-
§35.130(g) (Section-by-Section Analysis)
For example, it would be a violation of this paragraph for a local government to refuse to allow a theater company to use a school auditorium on the grounds that the company had recently...
-
Identification [§216.5, §502.6]
ISA designations on the parking surface, even if required by a state or local government, cannot substitute for above-ground signs that remain visible at all times....
-
Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis)
rooms with in-swinging doors, stairs, elevators, location of accessible routes to stages, accessible attorney areas and witness stands, assistive listening systems, and accessible teeing grounds...
-
§ 38.83(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground level, shall be sufficient when raised or closed, or a supplementary system shall be...
-
§ 38.125(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground or station platform level, shall be sufficient when raised or closed, or a supplementary...
-
§ 38.23(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground level, shall be sufficient when raised or closed, or a supplementary system shall be...
-
§ 38.159(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground level, shall be sufficient when raised or closed, or a supplementary system shall be...
-
§ 38.95(b)(5) Platform barriers
The loading-edge barrier (outer barrier) which functions as a loading ramp when the lift is at ground or station platform level, shall be sufficient when raised or closed, or a supplementary...
-
Section 36.406(e) Housing at a Place of Education (Section-by-Section Analysis)
There are other differences between the two sets of standards, including requirements for accessible windows, alterations, kitchens, an accessible route throughout a unit, and clear floor...
-
BACKGROUND
Install a sign identifying the van accessible space, and raise all of the signs identifying accessible spaces to at least 60-inches from the ground to the bottom of the sign, in accordance...
- Kohler Veil™ One-Piece Elongated Dual-Flush Wall-Hung Toilet With Reveal® Quiet-Close™ Seat
- Hill-Rom Liko® M220 / M230 Mobile Lift
-
Design Opportunity
27" AFF under the vanity top (306) while keeping the counter/rim at 34" AFF maximum (606.3); and it may require more than 8" minimum knee clearance to provide the extended depth clear floor...
-
This is a great unit but it's not "recessed", it's semi-recessed.
If you place this unit next to the accessible lavatory or other required clear space and don't allow room for the projection, it may interfere with the minimum required clear floor space...
-
Non-Positive Shut-off
Remember that the hose has to be at least 59" long so it would fall onto the floor of the tub if dropped. It's a plumbing safety requirement....
- Door King Inc. 9100 Slide Gate Operator Residential & Commercial
- GPK Modular QuadDesk
-
Spaces and Elements: ADA Standard Section 206.2.4
Section 206.2.4 covers the scoping requirements in the most current ADA Standards for accessible routes connecting spaces and elements within a building.
- Cybex Total Access Seated Leg Curl Exercise Machine
- Cybex Total Access Leg Press Exercise Machine
- Cybex Total Access Chest Press Exercise Machine
- Cybex Total Access Overhead Press Exercise Machine
-
When is accessibility required for a live work conversion project?
Background The building is a 2-story concrete structure with 37,690 sf on the first floor and 22,334 sf on the second floor The building’s freight elevator has been vacated/removed...