on-board wheelchair on a particular flight, you must provide it if the aircraft being used for the flight has more than 60 passenger seats, even if the aircraft does not have an accessible lavatory...
Search Results "Lavatory Clear Floor Space"
Commonly Searched Documents
-
§382.65(b)
-
8. Pipe Insulation
Does the lavatory in each accessible guestroom bathroom have drain and hot water pipes that are insulated or otherwise configured to protect against contact?...
-
Do basements count in determining a facility’s story count?
As defined in the Standards, a “story” pertains to those portions of buildings “designed for human occupancy included between the upper surface of a floor and upper surface of the floor...
-
306.3.1 General
Space under an element between 9 inches (230 mm) and 27 inches (685 mm) above the finish floor or ground shall be considered knee clearance and shall comply with 306.3....
-
306.3.1 General
Space under an element between 9 inches (230 mm) and 27 inches (685 mm) above the finish floor or ground shall be considered knee clearance and shall comply with 306.3....
-
306.3.1 General
Space under an element between 9 inches (230 mm) and 27 inches (685 mm) above the finish floor or ground shall be considered knee clearance and shall comply with 306.3....
-
306.3.1 General
Space under an element between 9 inches (230 mm) and 27 inches (685 mm) above the finish floor or ground shall be considered knee clearance and shall comply with 306.3. ...
-
Executive Summary
high and how low wheeled mobility device users can transfer to a platform above and below their mobility device seat, how high and how low users can transfer between two platform steps, clear...
-
4. My pool already existed before the effective date of the new rule. What am I required to do to provide pool access to customers with mobility disabilities?
The 2010 Standards for pool lifts require lifts to be fixed and to meet additional requirements for location, size of the seat, lifting capacity, and clear floor space....
- Boost Your Business - Chapter 12 - Elevators
-
Shower Threshold
The Board retained the ½ inch threshold height since positioning for transfer to the seat of transfer showers can be aided where a close approach enables footrests to clear the threshold...
- Lutron Sivoia QS Wireless Shading System
- Spectrum Aquatics Glacier Platform Pool Lift
- Integralift Fixed Ceiling Lift Short Instructional Video
-
306.2.4 Additional Clearance
Space extending greater than 6 inches (150 mm) beyond the available knee clearance at 9 inches (230 mm) above the finish floor or ground shall not be considered toe clearance....
-
306.2.4 Additional Clearance
Space extending greater than 6 inches (150 mm) beyond the available knee clearance at 9 inches (230 mm) above the finish floor or ground shall not be considered toe clearance....
-
10. Drinking fountains and water coolers
Accessible element or space ANSI A117.1 section APPLICATION 10....
-
11B-306.2.4 Additional clearance
Space extending greater than 6 inches (152 mm) beyond the available knee clearance at 9 inches (229 mm) above the finish floor or ground shall not be considered toe clearance....
-
306.2.4 Additional Clearance
Space extending greater than 6 inches (150 mm) beyond the available knee clearance at 9 inches (230 mm) above the finish floor or ground shall not be considered toe clearance....
-
306.2.4 Additional Clearance
Space extending greater than 6 inches (150 mm) beyond the available knee clearance at 9 inches (230 mm) above the finish floor or ground shall not be considered toe clearance....
-
4.25.3 HEIGHT
Accessible storage spaces shall be within at least one of the reach ranges specified in 4.2.5 and 4.2.6....
-
11B-306.2.4 Additional clearance
Space extending greater than 6 inches (152 mm) beyond the available knee clearance at 9 inches (229 mm) above the finish floor or ground shall not be considered toe clearance....
-
11B-306.2.4 Additional clearance
Space extending greater than 6 inches (152 mm) beyond the available knee clearance at 9 inches (229 mm) above the finish floor or ground shall not be considered toe clearance....
-
ETA Public Telephone Summary Chart and Survey Instructions
. [4.1.3(17)(a)] b. 1 per floor, when 1 bank is provided on this floor [4.1.3(17)(a)] c. 1 per bank, when 2 or more banks are provided on this floor....