The tops of tray slides shall be 28 inches (711 mm) minimum and 34 inches (864 mm) maximum above the finish floor or ground....
Search Results "Clear Ground Space"
-
11B-904.5.2 Tray slides
-
11B-904.5.2 Tray slides
The tops of tray slides shall be 28 inches (711 mm) minimum and 34 inches (864 mm) maximum above the finish floor or ground....
-
25.1 Q. It appears from Figure 2(c) of the Guidelines (under Requirement 5) that there is a 34 inch height requirement for kitchen counters and vanities. Is this true?
Requirement 7 addresses the requirement for usable kitchens and bathrooms so that a person in a wheelchair can maneuver about the space....
-
208.2 Minimum Number
Where more than one parking facility is provided on a site, the number of accessible spaces provided on the site shall be calculated according to the number of spaces required for each parking...
-
410 Platform Lifts
Section 410 provides requirements for platform lifts and addresses floor surfaces, clear floor space, operable parts, and doors and gates....
-
H. Door Maneuvering Clearance
.: entry door, connecting room door, bathroom doors and other passage doors) in every accessible guestroom/suite, are there at least 18" of clear floor space on the latch side for persons...
-
4.2.6* SIDE REACH
If the clear floor space allows parallel approach by a person in a wheelchair, the maximum high side reach allowed shall be 54 in (1370 mm) and the low side reach shall be no less than 9...
-
Are closet doors and pantry doors required to comply?
pantries, cabinets and other storage elements not providing user passage do not have to comply with provisions for doors, but must meet requirements for storage (§811), including those for clear...
-
11B-803.5 Coat hooks and shelves
Shelves shall be 40 inches (1016 mm) minimum and 48 inches (1219 mm) maximum above the finish floor or ground....
-
11B-803.5 Coat hooks and shelves
Shelves shall be 40 inches (1016 mm) minimum and 48 inches (1219 mm) maximum above the finish floor or ground....
-
SETTLEMENT AGREEMENT BETWEEN THE UNITED STATES OF AMERICA AND THE CAVALIERS OPERATING COMPANY, LLC
[See subsections ...]
-
Height: ADA Standard Section 903.5
The top of the bench seat surface shall be 17 inches (430 mm) minimum and 19 inches (485 mm) maximum above the finish floor or ground....
-
11B-306.3.2 Maximum depth
Knee clearance shall extend 25 inches (635 mm) maximum under an element at 9 inches (229 mm) above the finish floor or ground....
-
11B-306.3.2 Maximum depth
Knee clearance shall extend 25 inches (635 mm) maximum under an element at 9 inches (229 mm) above the finish floor or ground....
-
11B-903.5 Height
The top of the bench seat surface shall be 17 inches (432 mm) minimum and 19 inches (483 mm) maximum above the finish floor or ground....
-
Maximum Depth: ADA Standard Section 306.3.2
Section 306.3.2 covers the current ADA Standards for the maximum depth for knee clearance.
-
11B-1008.2.5 Ramps
Within play areas, ramps connecting ground level play components and ramps connecting elevated play components shall comply with Section 11B-1008.2.5....
-
11B-903.5 Height
The top of the bench seat surface shall be 17 inches (432 mm) minimum and 19 inches (483 mm) maximum above the finish floor or ground....
-
11B-1008.2.5 Ramps
Within play areas, ramps connecting ground level play components and ramps connecting elevated play components shall comply with Section 11B-1008.2.5....
-
Height: ADA Standard Section 902.3
The tops of dining surfaces and work surfaces shall be 28 inches (710 mm) minimum and 34 inches (865 mm) maximum above the finish floor or ground....
-
11B-902.3 Height
The tops of dining surfaces and work surfaces shall be 28 inches (711 mm) minimum and 34 inches (864 mm) maximum above the finish floor or ground....
-
11B-902.3 Height
The tops of dining surfaces and work surfaces shall be 28 inches (711 mm) minimum and 34 inches (864 mm) maximum above the finish floor or ground....
-
Getting From Here to There—Outdoor Recreation Access Routes
However, if the ground under the element isn't changed as part of that renovation or replacement project, this work doesn't trigger the requirement for outdoor recreation access routes....