BACKGROUND Three types of ALS are in widespread use at the present time: Induction Loop (IL) systems, Frequency Modulated (FM) radio systems, and Infrared (IR) systems....
Search Results "AGT: Automated Guideway Transit System"
Commonly Searched Documents
-
2. BACKGROUND
- Hearing Loop Systems Demo Video
- Alertus System Overview: USB Panic Button
-
Is color contrast required for stair nosings?
Visual contrast on stair nosings or the leading edges of treads is helpful for people with low vision, but it is not required by the Standards except at escalators in rail and fixed guideway...
-
LARGE AREA ASSISTIVE LISTENING SYSTEMS (ALS): REVIEW AND RECOMMENDATIONS
Large Area Assistive Listening Systems: Review and Recommendations Final Report to United States Architectural and Transportation Barriers Compliance Board (U.S....
-
Develop a Transition Plan
Public entities with 50 or more employees were required to develop a transition plan by July 26, 1992....
-
Sennheiser EKI 1029 Compact Multi-Channel Receiver
Requires the Premium User plan or above. (Login or upgrade your account!)
-
§ 37.3 FT Act
FT Act means the Federal Transit Act of 1964, as amended (49 U.S.C. App. 1601 et seq.)....
-
Section 1194.21 Software Applications and Operating Systems (Preamble, Section-by-Section Analysis)
systems....
-
11B-406.5.2 Width
The clear width of curb ramp runs (excluding any flared sides), blended transitions, and turning spaces shall be 48 inches (1219 mm) minimum....
-
11B-406.5.2 Width
The clear width of curb ramp runs (excluding any flared sides), blended transitions, and turning spaces shall be 48 inches (1219 mm) minimum....
-
11B-406.5.2 Width
The clear width of curb ramp runs (excluding any flared sides), blended transitions, and turning spaces shall be 48 inches (1219 mm) minimum....
-
219 Assistive Listening Systems
219 Assistive Listening Systems...
-
1007.8.1 System requirements
1007.8.1 System requirements. ...
-
Annualized Costs to Large Transit Entities for Automated Announcement Systems
Second, the Final RA also examines likely annualized costs related to the requirement that large transit entities provide automated announcement systems for stop and route identification...
-
II-5.3000 Curb ramps
This schedule must be included as part of a transition plan (see II−8.3000)....
-
Boarding Pier Clearances: ADA Standard Section 1003.3.2
At high water, the entire chain is floating and a transition plate connects the first float to the surface of the launch ramp....
-
1009.8.1 System requirements
Two-way communication systems shall provide communication between each required location and a central control point location approved by the fire department....
-
1009.8.1 System requirements
Two-way communication systems shall provide communication between each required location and the fire command center or a central control point location and a central control point is not...
-
What kinds of securement equipment must be provided in buses and vans?
Section 38.23(d) of the DOT ADA regulations requires all ADA-compliant buses and vans to have a two-part securement system, one to secure the wheelchair, and a seat belt and shoulder...
-
What kinds of securement equipment must be provided in buses and vans?
Section 38.23(d) of the DOT ADA regulations requires all ADA-compliant buses and vans to have a two-part securement system, one to secure the wheelchair, and a seat belt and shoulder harness...
-
11B-1003.3.2 Boarding pier clearances
At high water, the entire chain is floating and a transition plate connects the first float to the surface of the launch ramp....
-
706 Assistive Listening Systems
[See subsections ...]
-
706 Assistive Listening Systems
[See subsections ...]