Metal waste receptacle constructed of 100% recyclable galvanized steel. Removable lid with internal rigid liner. Capacity 26.4 gallons....
Search Results "Adjusted Construction Cost"
  Filters
  
    
      
  
      Commonly Searched Documents
- Magnuson Group STILO Waste Receptacles
 - Kohler Soho® Lavatory K-2053
 - Willoughby Industries DF-1015-96-HC Rear Mounted Drinking Fountain
 - Sargent 8200 Mortise Lock with BHL Trim
 - Speakman Commander Single Lever Kitchen Faucet S-3762
 - AJW Architectural Products US712 Series U7128B-1216 12"Wx16"H Security Concealed Mount Mirror, Angle Frame, Stainless Steel Surface
 - ASI Storage Solutions Angle Frame Locker
 - Better Living Signature Soap Dispenser 1
 - Better Living Clear Choice Soap Dispenser 1
 - Bradley 3-Station Express Crescent Lavatory System CRS-3
 - Better Living Ulti-Mate Soap and Shower Dispenser 3 with Mirror
 - Eliason Corporation RMR-1500 Traffic Door (Chase Doors - Durulite Retailer Door)
 - Willoughby Industries CWBF-3 Stainless Steel Outdoor Bottle Filler With ADA and Child Drinking Fountain
 - Healthcraft Invisia ADA Serenaseat™ Folding Shower Seat
 - Tork Elevation® Matic® Hand Towel Roll Dispenser with Intuition® Sensor, Black
 - AJW Architectural Products U374 Paper Cup Dispenser - Surface Mounted
 - Hoist HD-1900 Dual Pulley System
 - AJW Architectural Products U852 Dual Stall Seat Cover Dispenser - Partition Mounted
 - AJW Architectural Products U852H Dual Stall Seat Cover Dispenser w/ Flush Mounting - Partition Mounted
 - Norton Surface Mounted Heavy Duty 9500 Series Door Closer
 - Symmons Hand Shower T-600B-36-V
 - Inclusion Solutions BigBell™ Flex Alert System
 - 
    
  
  Accessibility of Airport Terminals and Facilities
  
Disability community commenters generally expressed support for this proposal; carriers and their organizations generally expressed concern about the cost and technical feasibility of accessible...
 - 
    
  
  Section 1193.23 Product design, development and evaluation (Section-by-Section Analysis)
  
"This appears," says TIA, "to omit consideration of the costs of making readily achievable determinations in the first place, prior to any expenditures on design, development and fabrication...