Search Results "Hybrid Surface System"
- Bradley 2-Station Express Lavatory System SS-2N Plan
-
Bradley 3-Station Verge Lavatory System LVRD3 Front Elevation
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Bradley 2-Station Verge Lavatory System LVRD2 Side Elevation
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Bradley 3-Station Verge Lavatory System LVRD3 Side Elevation
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Bradley 2-Station Express Lavatory System MG-2 Plan
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Turnstile Security Systems Inc. 6000 GB 1 Optical Turnstile
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Turnstile Security Systems Inc. 6000 GB 2 Optical Turnstile
Requires the Premium User plan or above. (Login or upgrade your account!)
-
Emergency Communications [4.10.14]
A voice intercommunication system is not required by ADAAG. An audio system with a visual display can provide information on the status of a rescue....
-
505.5 Clearance
Clearance between handrail gripping surfaces and adjacent surfaces shall be 1½ inches (38 mm) minimum. Figure 505.5 Handrail Clearance...
-
4.8.5(5)
(5) Top of handrail gripping surfaces shall be mounted between 34 in and 38 in (865 mm and 965 mm) above ramp surfaces....
-
11B-904.4.1 Parallel approach
A portion of the counter surface that is 36 inches (914 mm) long minimum and 34 inches (864 mm) high maximum above the finish floor shall be provided....
-
11B-904.4.1 Parallel approach
A portion of the counter surface that is 36 inches (914 mm) long minimum and 34 inches (864 mm) high maximum above the finish floor shall be provided....
-
11B-809.2.2 Turning space
For example, in kitchens, Section 11B-804.3.1 requires at least one work surface with clear floor space complying with Section 11B-306 to be centered beneath....
-
11B-809.2.2 Turning space
For example, in kitchens, Section 11B-804.3.1 requires at least one work surface with clear floor space complying with Section 11B-306 to be centered beneath....
-
Attachment H: Modifications to Altered Facilities
Attachment H: Modifications to Altered Facilities
-
What materials may satisfy ADAAG requirements?
In new construction and alterations, surface materials must be specified to be slip-resistant....
-
§ 37.121(a)
(a) Except as provided in paragraph (c) of this section, each public entity operating a fixed route system shall provide paratransit or other special service to individuals with disabilities...
-
11B-1008.2.5.3.2 Handrail height
The top of handrail gripping surfaces shall be 20 inches (508 mm) minimum and 28 inches (711 mm) maximum above the ramp surface....
-
1008.2.5.3.2 Handrail Height
The top of handrail gripping surfaces shall be 20 inches (510 mm) minimum and 28 inches (710 mm) maximum above the ramp surface....
-
11B-1008.2.5.3.2 Handrail height
The top of handrail gripping surfaces shall be 20 inches (508 mm) minimum and 28 inches (711 mm) maximum above the ramp surface....
-
11B-1008.2.5.3.2 Handrail height
The top of handrail gripping surfaces shall be 20 inches (508 mm) minimum and 28 inches (711 mm) maximum above the ramp surface....
-
1008.2.5.3.2 Handrail Height
The top of handrail gripping surfaces shall be 20 inches (510 mm) minimum and 28 inches (710 mm) maximum above the ramp surface....
-
Purpose
and other recreational properties with trails in the United States with descriptive and/or comparative information about the status of construction practices of pedestrian/hiker, natural surface...
-
Unified Facilities Guide Specifications
Facilities Guide Specifications In Section 02752, Portland Cement Concrete Pavement for Roads and Site Facilities, published by the National Institute of Building Sciences, it is stated that surfaces...