The top layer of a trail.
Search Results "Door Surface"
Commonly Searched Documents
-
Surface
-
T208.1 General
A passenger access route shall consist of a route complying with T208.2 between wheelchair spaces and doorways, walking surfaces complying with T302, and clearances complying with T504....
-
11B-404.2.4.3 Recessed doors and gates
, measured perpendicular to the face of the door or gate...
-
Maneuvering Clearances at Doors [4.13.6]
Maneuvering Clearances at Doors [4.13.6] Pull-side clearance beyond the door swing provides space for a forward reach to door hardware....
-
11B-404.2.4.3 Recessed doors and gates
, measured perpendicular to the face of the door or gate...
-
11B-404.2.4.3 Recessed doors and gates
, measured perpendicular to the face of the door or gate...
-
Surface
Surface—The top layer of ground on a recreation site, outdoor recreation access route, trail, or beach access route Firm. A surface that resists deformation by indentations....
-
404.2 Manual Doors, Doorways, and Manual Gates
Manual doors and doorways and manual gates intended for user passage shall comply with 404.2....
-
404.2 Manual Doors, Doorways, and Manual Gates
Manual doors and doorways and manual gates intended for user passage shall comply with 404.2....
-
802.1.1 Floor or Ground Surface
The floor or ground surface of wheelchair spaces shall comply with 302. Changes in level are not permitted. EXCEPTION: Slopes not steeper than 1:48 shall be permitted....
-
802.1.1 Floor or Ground Surface
The floor or ground surface of wheelchair spaces shall comply with 302. Changes in level are not permitted. EXCEPTION: Slopes not steeper than 1:48 shall be permitted....
-
R218 Doors, Doorways, and Gates (Section-by-Section Analysis)
R218 Doors, Doorways, and Gates (Section-by-Section Analysis) Doors, doorways, and gates to pedestrian facilities such as transit shelters must comply with applicable technical requirements...
-
Surface, Slope, and Openings [1011.2.2, 1011.2.3, and 1011.2.4]
The surface of the clear ground space must be firm and stable. Additional information on firm and stable surfaces is provided in the trails section of this guide....
-
4.3.6 Surface Textures
The surface of an accessible route shall comply with 4.5....
-
4.3.6 SURFACE TEXTURES
The surface of an accessible route shall comply with 4.5....
-
11B-411.3.4 Door delay
Door delay shall comply with Section 11B-407.3.5....
-
11B-411.3.4 Door delay
Door delay shall comply with Section 11B-407.3.5....
-
11B-411.3.4 Door delay
Door delay shall comply with Section 11B-407.3.5....
-
Must elevator doors remain open for 20 seconds?
LULA swing doors, private residence elevator doors, and platform lift gates and doors must remain open for 20 seconds minimum....
-
407.3.4 Door and Signal Timing
407.3.4 Door and Signal Timing....
-
Acceptable Trail Surfacing Requirements
Trail surfaces are currently considered accessible only if the surfacing material is firm, stable, and slip-resistant and the trail has the engineered attributes of adequate width, moderately...
-
4.13.6 MANEUVERING CLEARANCES AT DOORS
Minimum maneuvering clearances at doors that are not automatic or power-assisted shall be as shown in Fig. 25....
-
Power-Operated Doors or Gates
Platform lifts are required to have power-operated doors or gates....
-
b. Transfer Surface Location
The MDE NPRM proposed the same location and transfer sides of the transfer surface for diagnostic equipment used by patients in the supine, prone, or side-lying position (M301) and diagnostic...