Still other commenters addressed the effective date of the proposed standards, the triggering event by which the effective date is calculated for new construction, and variations on a safe...
Search Results "Completion of Construction"
Commonly Searched Documents
-
The Department's Rulemaking History
- Symmetry Limited Use/Limited Application (LU/LA) Elevator
- TownSteel MS Series, Grade 1 with Push Pull Mortise Locks
- Detecto 6550 Portable Wheelchair Scale
- Detecto BRW1000 Portable Wheelchair Scale
- Mannington Mills Allegiant Collection Commercial Carpet
- AccessRec De-Bug All Terrain Wheelchair
- Guardian Barrier-Free Safety Station with WideArea™ Eye/Face Wash GBF1909PCC
- Excel Dryer, Inc. CAST Cover Series HANDS OFF® Automatic Sensor Activated Hand Dryers
- Acoustiguide Opus Touch™ Museum Guide with Touchscreen
- Durateq® Handheld ATV (Assistive Technology Version) Device
- Acoustiguide Opus Click™ Multimedia Museum Guide
-
Accessibility of Airport Terminals and Facilities
The Americans with Disabilities Act Accessibility Guidelines (ADAAG) are the physical accessibility standards that apply throughout the airport (note, however, that until DOJ completes its...
-
Section 1193.23 Product design, development and evaluation (Section-by-Section Analysis)
One manufacturer interpreted the section as requiring a "checklist" which would need to be completed for each product. Response....
-
Section 36.402 Alterations (Preamble, Section-by-Section Analysis)
The Department agrees that the proposed rule would, in some instances, unfairly penalize projects that were substantially completed before the effective date....
-
Covered Content on Primary Web Sites
ITI, the association of leading information and communication technology companies, stated unequivocally that the complete Web site (all public-facing content on a carrier's primary Web...
-
Early Actions in the House
“By working together, we hope to develop language that we can agree upon, support, and introduce together."7 But the revised draft was already completed and Bartlett, Michel, and Goodling...
-
Negotiations Between the Senate and the White House
First, she emphasized that they needed to come up with a complete settlement: leaving any issue unresolved might undercut the agreements that were made....
-
4.3.7 Clear Floor Space for Reaching
Where reaching is critical for completing a task, e.g. an ATM machine, the universal clear floor space for reach (see accommodation model) should be provided and centered on the target....
-
3.2 Comparison of Sub-samples across Data Collection Sites
Scooter, four-wheeled 4 (1%) 0 (0%) 0 (0%) 4 (1%) Some of the research participants could not complete...
-
Section 36.402 Alterations (Section-By-Section Analysis and Response to Comments)
The Department agrees that the proposed rule would, in some instances, unfairly penalize projects that were substantially completed before the effective date....
-
Reduced scoping for play areas and other recreation facilities. (Section-by-Section Analysis)
They have been referenced in Federal playground construction and safety guidelines and in some State and local codes and have been used voluntarily when many play areas across the country...
-
TABLE OF CONTENTS
DESIGN SECTION 1607 LIVE LOADS CHAPTER 16A STRUCTURAL DESIGN SECTION 1607A LIVE LOADS CHAPTER 30 ELEVATORS AND CONVEYING SYSTEMS SECTION 3001 GENERAL CHAPTER 31 SPECIAL CONSTRUCTION...
-
A.
Murphy, 52 F. 570, 574 (5th Cir. 1892) (stating that courts must "lean in favor of a construction which will render every word operative rather than one which may make some idle and nugatory...