600 pound operating load capacity Stainless steel construction (electropolished 316L grade) Quiet and stable operation Includes a clear gate door to prevent entrapment...
Search Results "New Construction"
- Spectrum Aquatics Glacier Platform Pool Lift
- Symmons Temptrol II (BP Series) Shower System BP-56-500-B30-V
- PDQ 4200 Series Exit Device Door Hardware
- Aurora Doors Sliding Barn Door
- GameTime Bongos
- Delta Two Handle Blade Bar/Prep Faucet 2171LF-WBHHDF
- Bobrick Koala Kare Oval, Wall Mounted Baby Changing Station KB208
- Better Living Signature Soap and Shower Dispenser 2
- Carr Corporation Narcotics Locker NL10
- Scitec 2500 Series Single Line Desk and Wall Telephones
-
Section 36.303(g)(6) Alternative Technologies
Other comments also addressed whether the Department adequately addressed new technology....
-
Section 1.0 Background
In response to this lack of current information, the IDeA Center, with funding from the National Institute on Disability and Rehabilitation Research, developed a new set of anthropometric...
- Mannington Mills All Star Collection Commercial Carpet
- STI Stopper® Emergency Station, Push, Turn-to-Reset SS-2001E Fire Alarm
- Center for Disability Rights, Inc. (CDR)
- Guldmann Excellent Ramp System
- Ampetronic ILD1000G Professional Rack Mountable Audio Induction Loop Driver Hearing System
- TownSteel ED1300 Grade 1 Concealed Vertical Rod Panic Device
- Acoustiguide Mobile Application Platform with Assistive Technology
-
Greg Knoop. Daylighting
Aesthetics with these new technologies. We create “excellence” by the photographs that we look at....
-
B. Regulatory Flexibility Act
The proposed guidelines would be applicable only to new products to the extent that compliance is readily achievable; they would not require retrofitting of existing equipment or retooling...
-
Designed Use
The Managed Use of a trail that requires the most demanding design, construction, and maintenance parameters and that, in conjunction with the applicable Trail Class, determines which Design...
-
Work Areas [4.1.1(3)]
., designed so that certain elements can be added or altered for access after construction)....
-
Installation of Test Surfaces
Installation of Test Surfaces In accordance with standard EWF design and construction practice (Figure 2), the full depth surfaces were prepared to the same requirements needed for permanent...