Taking Measurements Sloped Surfaces One way to measure slope is to use a 24-inch level with leveling bubble and a tape measure....
Search Results "Transfer Surface"
Commonly Searched Documents
-
Taking Measurements
-
What was measured and why?
Often, an unstable surface, for example, may be perceived as very difficult because of the unstable footing, even though the individual does not have to exert him/herself....
-
3.1 Refining MDE Definition and Committee Scope
Although clinical personnel frequently transfer patients to stretchers,U in many instances patients get onto stretchers independently....
- Ultratec Superprint TTY
- Ultratec Superprint 4425 TTY
-
Resting Intervals [1017.8]
When the surface of the resting interval is constructed of concrete, asphalt, or boards, the slope of the resting interval must be no steeper than 1:48 (2 percent) in any direction....
-
Dune Crossings [1018.10]
The handrails must be continuous at a height of 34 to 38 inches above the walking surface along both sides of the dune crossing (figure 32)....
-
New Construction
Dining and Work Surfaces -- Sections 226 and 902. The provisions regarding accessible routes in section 206.2.5 (Restaurants and Cafeterias) also apply to dining surfaces....
-
Technical Requirements for Accessible Hiker/Pedestrian Trails
Section 7.4 of FSTAG explains the accessibility requirements for trails, including trail surfacing, clear tread width, grade and cross slope, resting intervals, passing spaces, tread obstacles...
-
Transit Stops (R308.1) (Section-by-Section Analysis)
The surfaces of boarding and alighting areas and boarding platforms must comply with the technical requirements for surfaces (see R302.7)....
-
406.8 Detectable Warnings
width of the curb ramp (exclusive of flared sides) and shall extend either the full depth of the curb ramp or 24 inches (610 mm) deep minimum measured from the back of the curb on the ramp surface...
-
Tread Obstacles on Beach Access Routes
When the surface of the beach access route is paved or is built with boards, tread obstacles must not be more than a half of an inch (13 millimeters) high....
-
1018.5 Obstacles
Where the surface is other than concrete, asphalt, or boards, obstacles are permitted to not exceed 1 inch in height measured vertically to the highest point....
-
A7. Curb Ramps
Is the ramp surface at least 36” wide, excluding flared sides? [ADA Stds 4.7.3] Yes _____ No _____ b. Is the slope (up or down the ramp) no more than 1:12? ...
-
R308.1 Transit Stops
Transit stops should be located so that there is a level and stable surface for boarding vehicles....
-
Instrumentation for Analysis
Appendix C) was created to collect data on the 11 trail segments including Rotational Penetrometer readings, inspection location in feet from trailhead, ruts, tread obstacles, or other surface...
-
11B-812.7.2 Marking
The color of the borderlines, hatched lines, and letters shall contrast with that of the surface of the access aisle....
-
1018.2 Aisles in assembly spaces
for applications listed in Section 1.9.1 regulated by the Division of the State Architect-Access Compliance, shall also comply with Chapter 11A or Chapter 11B, Section 11B-403 _|Walking Surfaces...
-
11B-505.10 Handrail extensions
Handrail gripping surfaces shall extend beyond and in the same direction of stair flights and ramp runs in accordance with Section 11B-505.10....
-
F240.1.1 Additions
At the time the second phase is complete, ramps must be used to connect at least 5 of the elevated play components and transfer systems are permitted to be used to connect the rest of the...
-
Fraudulent purchase of designated accessible seating. (Section-by-Section Analysis)
However, the proposed rule preserves the right of an individual with a disability to transfer his or her ticket for individual events and clarifies that the intermittent use of the wheelchair...
-
DOT Response
provider, the applicant, and the person responsible for the applicant's well-being should discuss the parameters of paratransit service, the paratransit agency's policies regarding attended transfers...
-
240.1.1 Additions
At the time the second phase is complete, ramps must be used to connect at least 5 of the elevated play components and transfer systems are permitted to be used to connect the rest of the...
-
Model Building Codes and Industry Standards
For example, unlike the ADA guidelines, the ANSI standards require an additional vertical grab bar at water closets, transfer shower stalls, and tubs....