[DSA-AC] That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
11B-703.4.1 Height above finish floor or ground
Tactile characters on signs shall be located 48 inches (1219 mm) minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches (1524...
-
11B-703.4.1 Height above finish floor or ground
Tactile characters on signs shall be located 48 inches (1219 mm) minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches (1524...
-
GUARD OR GUARDRAIL
A building component or a system of building components located at or near the open sides of elevated walking surfaces that minimizes the possibility of a fall from the walking surface to...
-
407.2 Contrast
Where provided, keys and controls shall contrast visually from background surfaces....
-
407.2 Contrast
Where provided, keys and controls shall contrast visually from background surfaces....
-
Story
That portion of a building or facility designed for human occupancy included between the upper surface of a floor and upper surface of the floor or roof next above....
-
Background
the contaminant or force is removed, the surface returns to its original condition.”...
-
Literature Cited
Standard specification for impact attenuation of surface systems under and around playground equipment, ASTM F1292....
-
11B-206.2.3.2 Distance to Elevators
new construction of buildings where elevators are required by Section 11B-206.2.3, and which exceed 10,000 square feet (929 m2) on any floor, an accessible means of vertical access via ramp...
-
11B-206.7.5 Existing site constraints
Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator infeasible. [2010 ADAS] Advisory 206.7.5 Existing Site Constraints. ...
-
Platform Lifts at Existing Site Constraints
Original ADAAG allowed use of platform lifts where ramps or lifts are infeasible due to existing site constraints (4.1.3(5), Exception 4(d))....
-
11B-206.7.5 Existing site constraints
Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator infeasible. [2010 ADAS] Advisory 206.7.5 Existing Site Constraints. ...
-
11B-206.2.3.2 Distance to Elevators
new construction of buildings where elevators are required by Section 11B-206.2.3, and which exceed 10,000 square feet (929 m2) on any floor, an accessible means of vertical access via ramp...
-
11B-206.2.3.2 Distance to Elevators
new construction of buildings where elevators are required by Section 11B-206.2.3, and which exceed 10,000 square feet (929 m2) on any floor, an accessible means of vertical access via ramp...
-
11B-206.7.5 Existing site constraints
Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator infeasible. Advisory 11B-206.7.5 Existing site constraints....
-
206.7.5 Existing Site Constraints
Platform lifts shall be permitted where existing exterior site constraints make use of a ramp or elevator infeasible. Advisory 206.7.5 Existing Site Constraints....
-
11B-244.1 General
The CBC requires raised areas of the facility to provide access by ramp, special access lift or elevator....
-
1009.2.1 Elevators required
installed in accordance with Section 903.3.1.1 or 903.3.1.2, the elevator shall not be required as part of the accessible means of egress on floors or occupiable roofs provided with a ramp...
-
11B-244.1 General
The CBC requires raised areas of the facility to provide access by ramp, special access lift or elevator....
-
904.4.1 Parallel Approach
A portion of the counter surface that is 36 inches (915 mm) long minimum and 36 inches (915 mm) high maximum above the finish floor shall be provided....
-
Objectives
The original development work, though targeted toward playground improvements, was eventually seen as a potential improvement for trail surfacing....
-
(c) Thresholds at patio, deck or balcony doors