A sequence of characters that can be programmatically determined and that expresses something in human language.
Search Results "RTT: Real-Time Text"
Commonly Searched Documents
- 
    
  
  Text
  
- 
    
  
  Text
  A sequence of characters that can be programmatically determined and that expresses something in human language. 
- 
    
  
  Text
  A sequence of characters that can be programmatically determined and that expresses something in human language. 
- 
    
  
  Door and Signal Timing: ADA Standard Section 407.3.4
  Section 407.3.4 covers the current ADA Standards for door and signal timing of elevator reopening devices. 
- 
    
  
  407.5 Timed Response (Section-by-Section Analysis)
  407.5 Timed Response (Section-by-Section Analysis) This section proposes to require that where a timed response is required, ICT would have to alert the user visually, as well as by touch... 
- 
    
  
  Color meaning embedded in alt-text
  The information conveyed in text may be placed in the alt-text, but it should not be the only place that the text is shown.... 
- 
    
  
  11B-407.3.4 Door and signal timing
  The minimum acceptable time from notification that a car is answering a call until the doors of that car start to close shall be calculated from the following equation: T = D/(1.5 ft/... 
- 
    
  
  §1193.41(g) Operable without time-dependent controls
  (g) Operable without time-dependent controls. Provide at least one mode that does not require a response time.... 
- 
    
  
  703.6.3 Text Descriptors
  Pictograms shall have text descriptors located directly below the pictogram field. Text descriptors shall comply with 703.2, 703.3 and 703.4.... 
- 
    
  
  Door and Signal Timing
  Section 407.3.4 specifies door and signal timing.... 
- 
    
  
  Paragraph (g) Operable without time-dependent controls (Section-by-Section Analysis)
  Paragraph (g) Operable without time-dependent controls (Section-by-Section Analysis) Comment. The NPRM had proposed a three-second time limit.... 
- 
    
  
  § 1194.22(a)
  (a) A text equivalent for every non-text element shall be provided (e.g., via “alt”, “longdesc”, or in element content).... 
- 
    
  
  §1193.43(c) Access to moving text
  (c) Access to moving text. Provide moving text in at least one static presentation mode at the option of the user.... 
- 
    
  
  Door and Signal Timing for Hall Calls [4.10.7], Door Delay for Car Calls [4.10.8]
  Timing, based on the distance between the farthest call button and the elevator door, begins with visible and audible signaling of car arrival.... 
- 
    
  
  A4.10.7 Door and Signal Timing for Hall Calls
  This paragraph allows variation in the location of call buttons, advance time for warning signals, and the door-holding period used to meet the time requirement.... 
- 
    
  
  A4.10.7 DOOR AND SIGNAL TIMING FOR HALL CALLS
  This paragraph allows variation in the location of call buttons, advance time for warning signals, and the door-holding period used to meet the time requirement.... 
- 
    
  
  §100.115 Residential real estate-related transactions.
  The term residential real estate-related transactions means:... 
- 
    
  
  4.10.7* Door and Signal Timing for Hall Calls
  The minimum acceptable time from notification that a car is answering a call until the doors of that car start to close shall be calculated from the following equation: T = D/(1.5 ft/... 
- 
    
  
  4.10.7* DOOR AND SIGNAL TIMING FOR HALL CALLS
  The minimum acceptable time from notification that a car is answering a call until the doors of that car start to close shall be calculated from the following equation: T = D or T = D... 
- 
    
  
  Paragraph (c) Access to moving text (Section-by-Section Analysis)
  Paragraph (c) Access to moving text (Section-by-Section Analysis) Comment.... 
- 
    
  
  R306.2 Pedestrian Signal Phase Timing
  R306.2 Pedestrian Signal Phase Timing.... 
- 
    
  
  §100.141 Residential real estate-related lending transaction
  Residential real estate-related lending transaction means the making of a loan: (1) For purchasing, constructing, improving, repairing, or maintaining a dwelling; or (2) Secured by... 
- 
    
  
  Pedestrian Signal Phase Timing (Section-by-Section Analysis)
  Pedestrian Signal Phase Timing (Section-by-Section Analysis) Pedestrian signal phase timing must comply with referenced MUTCD standards and use a pedestrian clearance time that is calculated... 
- 
    
  
  Paragraph (g) (Advisory Guidance)
  Paragraph (g) Operable without Time-Dependent Controls 1. Many persons find it very difficult to operate time-dependent controls. 2.... 
